Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    Industry: Rehabilitation and maintenance at the electrical depot station

    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 268390
    Join date : 2012-12-21

     Industry: Rehabilitation and maintenance at the electrical depot station Empty Industry: Rehabilitation and maintenance at the electrical depot station

    Post by Rocky Mon 22 Jan 2018, 3:01 am

    [size=30]Industry: Rehabilitation and maintenance at the electrical depot station[/size]
    22/01/2018 11:36 | Number of readings: 1
    font size: [You must be registered and logged in to see this image.] [You must be registered and logged in to see this image.]
    [rtl]Trend Press / Baghdad[/rtl]
     
     
    [rtl]The General Company for Engineering Inspection and Qualification, a company of the Ministry of Industry and Minerals contracts for the implementation of the rehabilitation and maintenance work at the electric depot station and the rehabilitation of storage stores of chemicals in the company refineries center.[/rtl]
     
    [rtl]"The company signed a contract with the General Directorate for the production of electric power station Dabs gas station to rehabilitate, maintain and repair the electric transformer type (63 MVA) worth ( "The technical cadres in the company carried out the mechanical and electrical work and replace the damaged parts and conduct comprehensive engineering checks at the site of the mentioned station and work continuously until the completion of the contract in full by the deadline."[/rtl]
     
    [rtl]He added that "the company also contracted with the company refineries center of the Ministry of Oil to rehabilitate warehouses for the preservation of chemical materials number two of the amount of the contract of (628) million and (842) thousand dinars with the completion of (200) days, pointing out that" Reinforced concrete floors with wall & roofing cladding with sandwich panels as well as carrying out maintenance works of electrical & windows by the technical cadres of the company and supervising the most skilled engineers.[/rtl]
     
    [rtl]In another context, Jabara said that the administrative review meeting of ISO 17020 (2012 ) was held in the presence of the UNIDO expert.[/rtl]
     
    [rtl]He pointed out that "this meeting is the last requirement of obtaining accreditation in the field of international inspection in accordance with the mentioned standard where the meeting discussed the administrative and technical procedures and quality manual and make the necessary modifications to the management system and review requirements for obtaining the certificate and international inspection of equipment in accordance with standard specifications to become inspection certificates Of the equipment issued by the company is recognized internationally. "[/rtl]



    [rtl][You must be registered and logged in to see this link.]
    [/rtl]

      Current date/time is Thu 18 Apr 2024, 10:43 pm