Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    Petroleum products announce the completion and rehabilitation of the largest site for the supply of

    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 267084
    Join date : 2012-12-21

     Petroleum products announce the completion and rehabilitation of the largest site for the supply of Empty Petroleum products announce the completion and rehabilitation of the largest site for the supply of

    Post by Rocky Tue Dec 18, 2018 6:12 am

    Petroleum products announce the completion and rehabilitation of the largest site for the supply of tubs in Iraq

    [You must be registered and logged in to see this image.]


    The General Company for Petroleum Products announced on Tuesday the completion and rehabilitation of the largest site for the construction of tubing in Iraq in Nineveh.
    "The Ministry of Oil and through the distribution company gave special attention to the Nineveh file because of the conditions that were caused during the period of occupation, which caused damage to most of its infrastructure," the company's general manager, Engineer Kazem Masir, said in a statement.
    "We have completed, with the help of God, the construction and rehabilitation of the tanker site in Al Hadbaa warehouse, which is the largest site in the country and will be opened in the coming period. We have prepared plans for the reconstruction of filling stations and warehouses to restart them to serve the citizens of the province."
    He pointed to the most important works completed during the rehabilitation of the warehouse, saying, "Our engineering and technical staffs completed the balance of the 100 ton tonnage and completed the loading pipelines and unloading pipes in addition to the installation of two bulldozers, 6 dump pumps and 6 loading pumps. Load number 2 and full counters number 6 ".
    For his part, said the director of the branch of Nineveh oil products Falah Hassan, "Through the guidance and follow-up ongoing by the Minister of Oil and the Director General of the company we have done many and extensive work over (90) days, the completion of the work in the warehouse Hdbaa, which reached 100% Of engineers and qualified technicians, stressing that "we are preparing in the next time to open and return to service to provide services to citizens in the province. 
    Hassan added that "the branch staffs are continuing to work in the final stages to rehabilitate four government stations (Nineveh station, Ibn al-Atheer station, Culture station and Al-Shuhadaa station), adding that the opening of these sites will take place soon. 
    It is worth mentioning that the oil products distribution company has rehabilitated several stations and warehouses in Nineveh Governorate, where thirty government stations, as well as the Wadi Hajar and Alwiliya governmental warehouses as well as Emaar have been rehabilitated in a number of private stations. Distributive.

    [You must be registered and logged in to see this link.]

      Current date/time is Fri Mar 29, 2024 5:01 am