Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    Pictures: Maliki opened the second expansion of the water project east of the Tigris done a contract

    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 268443
    Join date : 2012-12-21

    Pictures: Maliki opened the second expansion of the water project east of the Tigris done a contract Empty Pictures: Maliki opened the second expansion of the water project east of the Tigris done a contract

    Post by Rocky Mon 22 Jul 2013, 7:23 am

    Pictures: Maliki opened the second expansion of the water project east of the Tigris done a contractual cost of 38 billion dinars
     
    July 22, 2013 - 06:50 p 


    Was opened by Prime Minister Nuri al-Maliki's second expansion to the east of the Tigris water project accomplished by the Municipality of Baghdad card (180) thousand cubic meters per day to serve most areas of Rusafa.

    The prime minister stressed in his speech on the sidelines of the opening ceremony, which was attended by Secretary of Baghdad Abdul Hussein Morshedi and proxy municipal and landlords advanced in the Secretariat said that "This project is part of a series of projects created in order to provide needs of the people of the capital Baghdad of drinking water and treatment of health in spite of all challenges and difficulties. "

    Maliki said it was "happy moment can go quick step to respond to the needs and requirements of the people of Baghdad and service life, particularly with regard to the provision of safe drinking water through the establishment of projects and the elimination of health."
    He said the "project east of the Tigris will add new energy to an estimated 180 thousand m3 per day to serve most areas of Rusafa and will eliminate health once the completion of the first phase of the Rusafa water project big card (910) thousand m3 per day in spite of attempts abusers who put obstacles in the way done and sabotage some of its facilities, "expected" accomplished the end of the year. "
    And the price of the Prime Minister the efforts of the secretariat of Baghdad and secretary (Abdul Hussein Morshedi) Advanced and owners in the Secretariat, which contributed to a quantum leap towards the reconstruction of the city of Baghdad and the advancement of their betterment service. "
    For his part, Secretary of Baghdad Abdul Hussein Morshedi "The opening of this strategic project by the Prime Minister is an important indicator of support for the Municipality of Baghdad and an incentive to move forward towards the implementation of strategic projects and provide better services to the people of the capital Baghdad, especially Maitalq sectors of pure water and sanitation and the establishment of road networks and building Almgesrat and spending and others. "
    "The water project east of the Tigris بتوسعته second is one of the important projects that have succeeded the Municipality of Baghdad in complete them and entered today's active service card 180 thousand cubic meters per day to service areas and shops housing located within the municipalities of people and chest first and chest second Bourne and New Baghdad down to the outskirts of Baghdad, at a cost of contractual reached (38) Mayar dinars ", pointing out that the total energy of the project amounted to (945) thousand cubic meters per day"

    The Morshedy that "the opening of this project and other projects will contribute to the increased amounts of water product and improve its quality in conformity with the standards of the World Health Organization with the increase in pressure in the distribution networks and contribute to addressing a large part of health and access water to remote areas, which are located at the ends of lines tanker east channel the army. "

    "The three other projects will be completed and enter service successively during the current year is the reservoir Ground (R9) in the area (Jadiriya) with a capacity of design (30) thousand cubic meters and serves the Karrada district and some neighborhoods and the reservoir Ground (R7) in the municipalities, which serves areas (nursery and municipalities, perfectionism and al-Obeidi) a capacity of 120 thousand cubic meter reservoir and ground (R5), which serves areas of Rusafa card center Khoznah $ (75) thousand cubic meters of pure water. " He pointed out that "the Department of Water Baghdad began actually run the tank ground (R14) in the area of ​​adult granule its capacity (110) thousand cubic meters of pure water and serves most sectors of Sadr City."
    N. particular agency

    Thread in pictures


    [You must be registered and logged in to see this link.]
    [You must be registered and logged in to see this image.]

      Current date/time is Fri 19 Apr 2024, 1:13 pm