Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    Electricity to conclude two contracts for the installation and operation of 6 solar power stations i

    rocky
    rocky
    NNP TEAM
    NNP TEAM


    Posts : 241706
    Join date : 2012-12-21

    Electricity to conclude two contracts for the installation and operation of 6 solar power stations i Empty Electricity to conclude two contracts for the installation and operation of 6 solar power stations i

    Post by rocky Sat 28 Oct 2017, 1:55 am

    [You must be registered and logged in to see this image.]
    Electricity to conclude two contracts for the installation and operation of 6 solar power stations investment


    Baghdad / Range 

    "The contract was signed by the General Directorate for the production of electric power in the central region and the General Directorate for the production of electric power in the Middle Euphrates with the company (Sama Baghdad) Jordan, which is combined with the company" Five of which are in Anbar province (Ramadi) with a production capacity of 100 MW and Faluja with a production capacity of 40 MW and Amriya Al Samoud with a production capacity of 50 MW and Karma with a production capacity of 50 MW. (240) megawatts, and the sixth station is the Alexandria station, with a capacity of (225) megawatts in the province of Babylon. The teacher pointed out that the project implementation period is (8) months and an investment period of (15) years, and the Ministry will purchase electricity from the company invested at (3.5) three and a half cents per kilowatt-hour, (35) dollars per megawatt. The representative of the distribution and transport Abdul Hamezah Hadi, expressed optimism about the conclusion of such a contract with an American company invested, which was considered a new direction of the Ministry to invest sunlight to generate electricity, indicating that Iraq enjoys the light of the sun in large quantities and throughout the year, making investment this blessing Is a positive factor in increasing the productive capacity of the national electrical system, which is reflected in increasing the hours of processing for citizens.
    For his part, the representative of the Embassy and the American company in Iraq expressed his happiness with the conclusion of this contract, saying that we will work with all our efforts with the Ministry of Electricity to provide them with a good, clean and non-high price electrical card. We are also pleased with the work of the private sector in the United States with the Ministry of Electricity. And invested in Iraq.