Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality

Iraq Dinar/News is a popular topic among many topics this board offers. You must log in to see and participate in our Dinar sections.

Position yourself for free after watching the video on eCommerce at www.nenosplace.ipronetwork.com

Neno

I can be reached by phone or text 7am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2017


Baghdad Municipality announces maintenance of all vertical and submersible stations in anticipation

Share
avatar
rocky
Moderator
Moderator

Posts : 105777
Thanked : 3894
Join date : 2012-12-21

Baghdad Municipality announces maintenance of all vertical and submersible stations in anticipation

Post by rocky on Tue 14 Nov 2017, 2:22 am

[size=30]Baghdad Municipality announces maintenance of all vertical and submersible stations in anticipation of precipitation[/size]
14/11/2017 10:56 | Number of readings: 1
font size: [You must be registered and logged in to see this image.] [You must be registered and logged in to see this image.]
[You must be registered and logged in to see this image.]
Trend Press / Baghdad
The Municipality of Baghdad announced the completion of maintenance and rehabilitation of all vertical and submersible stations within the district of Sadr City first.
 
A statement by the Directorate of Relations and Information in Baghdad Municipality received a copy of the direction of the Department of the Department of Electrical and Mechanical Works of all stations and submersible and vertical and the formation of Algwats and cleaning the sugars for the durability of work at maximum capacity, especially in the case of heavy rain.
 
He added: The staff of the sewer department also maintained the generators of electric power to operate the stations in the event of a national power failure and the processing of generators fuel and replace the damaged batteries.
 
"The department has also completed the cleaning of subways and pipelines for sewage and rain, cleaning the flow lines and compensating the lost and damaged manholes."
 
He pointed out that the department is working on replacing the payment line of station 6 in Al Falah Street with a length of 400 meters and a diameter of 500 mm and a depth of two meters by replacing the old pipe with a new plastic pipe and connecting the 5 station line to the emergency line "4" of the second district of Sadr City in the direction of the police channel with a length of "50" meters and a diameter of "400" mm in Al Jawadar Street and the front of Sector "44".

[You must be registered and logged in to see this link.]

    Current date/time is Sun 19 Nov 2017, 8:02 am