Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    Communications: Repairs of optic cables between Anbar, Baghdad and Karbala

    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 267079
    Join date : 2012-12-21

    Karbala -  Communications: Repairs of optic cables between Anbar, Baghdad and Karbala Empty Communications: Repairs of optic cables between Anbar, Baghdad and Karbala

    Post by Rocky Mon Jan 08, 2018 4:49 am

    [size=30]Communications: Repairs of optic cables between Anbar, Baghdad and Karbala[/size]
    08/01/2018 10:46 | Number of readings:
    font size: [You must be registered and logged in to see this image.] [You must be registered and logged in to see this image.]
    [You must be registered and logged in to see this image.]
    Trend Press / Baghdad
     
     
    The Ministry of Communications announced that the engineering and technical staff repaired optical cable segments between Anbar, Baghdad and Karbala and raise the conflicts of a number of cabins in Karbala.
     
    According to a statement by the Office of the Minister of Communications, "Trend Press" obtained a copy of it on Monday, that the engineering and technical staff has raised the discrepancies in telephone cabins, which are 13 cabins, which contradict the work of the tunnel to be implemented in the door of the kiss of Imam Hussein (p) in coordination with the Secretariat of the threshold (Capacity of 1000 pairs and capacity of 800 pairs and capacity of 600 pairs and a cable of 200 pairs). "Materials and an alternative route will be provided for the restoration of the telecommunications and Internet service at the expense of the General Secretariat of the Husseiniya threshold."
     
    On the other hand, the statement pointed out that the engineering and technical staff in the Directorate of Communications Anbar was able to carry out a large campaign in the district of Khalidiya to maintain its telephone network and repair the cable capacity (1500) common feeds the area of ​​friends and the Khalidiya exchange center and replaced the old decrees and new pillars and cabins in In Hasiba al-Sharqiya, which is part of the Khalidiya district, as a prelude to "restoring landline services to citizens and government institutions."
     
    In the same context, the engineering and technical cadres of the Communications Division and the Cable Authority in Anbar Communications have mobilized all efforts to repair and maintain optical cables for the two western directions towards Karbala, Baghdad and the east towards Fallujah Baghdad, which led to the interruption of the service completely to the governorate communications and the border port of Trebil. The western parts of Al-Nukhayb area were treated in the direction of Al-Nukhayb area. The eastern parts were also addressed to Faluja-Baghdad. The work was completed and the maintenance center was contacted. CD from entering the service of the two-way and return them properly and provide the best services to all beneficiaries of the citizens' security and government institutions. "







    [You must be registered and logged in to see this link.]

      Current date/time is Thu Mar 28, 2024 8:49 am