Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    Electricity: The solar photovoltaic plant is started with a capacity of one megawatt

    rocky
    rocky
    NNP TEAM
    NNP TEAM


    Posts : 240820
    Join date : 2012-12-21

    Electricity: The solar photovoltaic plant is started with a capacity of one megawatt Empty Electricity: The solar photovoltaic plant is started with a capacity of one megawatt

    Post by rocky Mon Apr 09, 2018 12:27 pm

    Electricity: The solar photovoltaic plant is started with a capacity of one megawatt



    [You must be registered and logged in to see this image.]

    The Ministry of Electricity announced on Monday that the first phase of the solar PV plant at the ministry's headquarters will be started with one megawatt capacity by the joint national team between the Ministry of Electricity and the Ministry of Industry and Minerals.
    "The solar station was connected to the national grid with a capacity of 150 kW after the arrival of the first batch of German-based electrical reflectors," a ministry statement said.
    He added that "this plant is the first pilot project of its kind in Iraq with a large capacity in the production of electric power of solar energy, which in turn will cover 75% of the ministry load of 1.25 / megawatts and after the end of working hours will be exported energy generated to the network National. " 
    "The project has been planned and implemented by Iyad Iraqi 100%. The solar panels that were previously used in the street lighting project were used after the rehabilitation and inspection, where these panels were neglected and stored in the stores of the directorates without interest."
    "This project, if implemented in the government sector, will reduce consumption to 30 percent of total electricity consumption during daylight hours," he said.

    [You must be registered and logged in to see this link.]

      Current date/time is Wed Mar 22, 2023 5:41 am