Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    The opening of the marine "dock" berth after its reconstruction and rehabilitation

    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 267081
    Join date : 2012-12-21

    The opening of the marine "dock" berth after its reconstruction and rehabilitation Empty The opening of the marine "dock" berth after its reconstruction and rehabilitation

    Post by Rocky Sat 05 May 2018, 6:31 am

    The opening of the marine "dock" berth after its reconstruction and rehabilitation
    May 05 2018 12:11 PM
    [You must be registered and logged in to see this image.]
    [rtl][rtl]The northern port of Um Qasr - archival[/rtl]
    [/rtl]
    Baghdad Post
    [rtl]


    The General Company for Iraqi Ports opened on Saturday the berth of the Marine Industries Division after its reconstruction and rehabilitation. 

    The company's director of communications, Anmar Abdul-Moneim Al-Safi said in a press statement, "The company's marine and shipyards department was able to return the wharf of the Marine Industries Division leading to the floating basin of Hittin after conducting the deep-water survey on the façade and sides of the pier by the specialists in the Division Marine Survey of the Marine Drilling Section.


    He added that the launch of the pier by laying the tugboat Samarra, which is waiting for its role to float on the floating basin Hittin.


    Al Safi said: "With this achievement, the berth will be fully prepared for the establishment of a naval unit such as trawlers, specialized boats and some medium pieces waiting for its role, whether for maintenance, maintenance or rehabilitation, instead of laying it.



    [You must be registered and logged in to see this link.]
    [/rtl]

      Current date/time is Fri 29 Mar 2024, 3:54 am