Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    The start of gas production from Nasiriyah oil field for the first time

    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 272498
    Join date : 2012-12-21

    The start of gas production from Nasiriyah oil field for the first time Empty The start of gas production from Nasiriyah oil field for the first time

    Post by Rocky Tue 12 Jun 2018, 5:56 am

    The start of gas production from Nasiriyah oil field for the first time
    June 12 2018 10:25 p
    [You must be registered and logged in to see this image.]
    [rtl][rtl]An Iraqi oil field[/rtl]
    [/rtl]
    Baghdad Post
    [rtl]


    The Dhi Qar oil company, in cooperation with the South Gas Company, is implementing the Nasiriyah gas investment project in the province. 

    A member of the oil committee in the province of Dhi Qar, Zeinab Khalaf, said that "the Dhi Qar oil company, in cooperation with the South Gas Company, initiated the project of Nasiriyah gas accelerated through the contract with Italian Floyd to rent the GTU station to purify and dry the accompanying gas.


    "This step comes within the framework of the optimal investment of natural resources to maximize state imports and to reduce the burning of gas associated with crude oil." 

    "The project aims to invest gas phase I, which constitutes the largest proportion of the total gas associated with the field of Nasiriyah oil," noting that "it is hoped to complete the installation of equipment during the next two months, and then begin the pilot operations."


    It is noteworthy that the cadres of the oil company Dhi Qar completed the beginning of the current year 2018 extension of the pipeline 14 knots for the transfer of gas associated from the gas isolation station Nasiriyah to the pipeline of national export.

     

    [You must be registered and logged in to see this link.][/rtl]

      Current date/time is Mon 24 Jun 2024, 7:28 am