Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    The opening of the first laboratory in Iraq to produce cooling devices with a capacity of 400 device

    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 267061
    Join date : 2012-12-21

    opening - The opening of the first laboratory in Iraq to produce cooling devices with a capacity of 400 device Empty The opening of the first laboratory in Iraq to produce cooling devices with a capacity of 400 device

    Post by Rocky Wed May 01, 2019 8:23 am

    The opening of the first laboratory in Iraq to produce cooling devices with a capacity of 400 devices every 8 hours

    14:06 - 01/05/2019



    [You must be registered and logged in to see this link.]
    BAGHDAD - 
    The General Secretariat of the Holy Husseiniya threshold opened on Wednesday the Al-Ward plant for the production of cooling equipment in the holy province of Kerbala, which is the first of its kind, pointing out that the plant produces 400 devices every eight hours. 
    "The project aims at providing a national product with high ISO and international specifications," said Safaa Ali, head of the cooling division at the Husseiniya threshold. "The plant has a production capacity of 400 cooling machines every 8 hours and there is ambition To reach 100 thousand machines this year. "
    [You must be registered and logged in to see this image.]
    "The plant has two lines for assembling materials in sizes ranging from 1 ton to 5 tons," he said. "The project is not aimed at achieving profits in the first place, but rather for instilling confidence among the employees and supervisors in all sectors in the national industry, Work in the engineering and technical specialties. "
    [You must be registered and logged in to see this image.]
    He pointed out that "Heirat cooling devices are low consumption of electricity compared to the devices available in the local markets as well as withstand the rise of temperatures above the limit of 60 degrees Celsius."
    [You must be registered and logged in to see this image.]
    "The threshold of Husseiniya has a great ambition to open other factories for multiple electrical devices in order to preserve the money and ensure their survival inside [You must be registered and logged in to see this link.] " he said. Ending / 25





    [You must be registered and logged in to see this link.]

      Current date/time is Thu Mar 28, 2024 8:19 am