Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


Engineer: resume the production of oil field Libyan oil half capacity

rocky
rocky
NNP TEAM
NNP TEAM

Posts : 203418
Join date : 2012-12-21

Engineer: resume the production of oil field Libyan oil half capacity Empty Engineer: resume the production of oil field Libyan oil half capacity

Post by rocky Mon 22 Jul 2019, 2:46 am

Engineer: resume the production of oil field Libyan oil half capacity

Engineer: resume the production of oil field Libyan oil half capacity 16375








Economy News Baghdad
The Libyan oil field resumed production half-capacity Monday, after stopping since Friday because of the closure of a valve, an engineer in the spark field said.
Libya's National Oil Corporation said in a statement that the valve was repaired on Sunday evening, allowing the pumping of oil back to the port of Zawia.
The company added that the shutdown caused a production loss of about 290 thousand barrels per day valued at 19 million dollars.


    Current date/time is Fri 22 Oct 2021, 9:03 am