Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    Resumption of the implementation Mjsr caliphs after treatment infrastructure conflicts

    chouchou
    chouchou
    Moderator
    Moderator


    Posts : 5059
    Join date : 2012-12-20

    Resumption of the implementation Mjsr caliphs after treatment infrastructure conflicts Empty Resumption of the implementation Mjsr caliphs after treatment infrastructure conflicts

    Post by chouchou Sun Oct 13, 2013 6:17 am

    [You must be registered and logged in to see this image.]

    Municipality of Baghdad resumed stages Mjsr implementation caliphs in the area of ​​the holy door after the cessation of work during the past period because of conflicts infrastructure, while embarked on the Ministry of Construction to rehabilitate the damaged part of the bridge quick Mohammad Qasim in the session.

    The head of the Department of the resident engineer in the Secretariat Zaid Faisal Mahdi's (Center Brief for the Iraqi Media Network) that the cadres of the Municipality of Baghdad resumed in coordination with the company executing the project Mjsr caliphs in the door holy work of the new site Almgesr after a hiatus of several months due to the emergence of conflicts technical infrastructure underground infrastructure to the project site is not registered in the basic maps, referring to the completion of the concrete pillars of the Mjsr 148 guestrooms and substrate body Almgesr up the earth's surface and installation of concrete joists and latex pillows and some interfaces Almgesr.

    He explained that the conflicts technical emergency infrastructure that appeared in the site beginning and end of Almgesr from the north and south sides was the existence of two tubes of the streams Qatar's first 700 mm and the second 325 mm pipeline to transport drinking water in diameter (600 mm) with a seven cables for electricity and other communications, explaining that the new designs approved by the Secretariat necessitated the installation (700) substrate additional new areas of conflicts of infrastructure and increasing the length of Almgesr a distance of 60 meters by 30 meters at the beginning of Almgesr and again at the end to ensure the process of maintaining pipeline core cables original and provide services through the ability itself, in addition to the lines new alternative.

    In the same context, embarked on technical and engineering staff of the Ministry of Construction and Housing reconstruction Muhammad al-Qasim Bridge rapid in the Dora district in southern Baghdad after suffering during the last term for a car bomb explosion damaged the bridge right.

    The Minister of Construction and Housing Eng Mohammed Darraji, had confirmed that the ministry will be the reconstruction of the bridge as soon as possible in accordance with the technical specifications to be available before the citizens being one of the important and vital bridges in Baghdad.


    [You must be registered and logged in to see this link.]

      Current date/time is Sun May 19, 2024 11:21 am