Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    Maysan Electricity: oil processing training institute in architecture electric power

    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 270229
    Join date : 2012-12-21

    Maysan Electricity: oil processing training institute in architecture electric power Empty Maysan Electricity: oil processing training institute in architecture electric power

    Post by Rocky Thu 25 Feb 2016, 3:19 am

    [ltr]Maysan Electricity: oil processing training institute in architecture electric power[/ltr]

     Since 02.25.2016 at 10:10 (Baghdad time)
    [ltr][You must be registered and logged in to see this image.][/ltr]
    [ltr]Maysan balances News[/ltr]
    [ltr]Maysan announced electricity distribution Directorate, Thursday, for the completion of the processing power of the Institute for the training of oil in architecture.[/ltr]
    [ltr]Said Director of the Directorate Falih Hadi Alwan in a statement received / balances News / copy of it, "engineering and technical staffs have completed the work of the project delivery of electricity to the southern oil Training Institute of Architecture."[/ltr]
    [ltr]Alwan added, that "the Institute's newly created by the Maysan Oil Company, and that the work of the project has the Mlakatna in the execution department directly."[/ltr]
    [ltr]He continued that "the realization was the D nutritious phrase (11 k. Q) Ground-long (2 km) out of the Awahh station down to the Institute, with the monument Box adapters number (4) Capacity / 1000 K. P) as well as set up equipment to link" .[/ltr]
    [ltr]He explained that "the project within the non-plan projects, and the beneficiary is under the Ministry of Oil Maysan Oil Company."[/ltr]
    [ltr]He pointed out that "the total cost of the project amounted to (804 million) of one hundred and four million Iraqi dinars eight, and extended work there (180) days."[/ltr]
    [ltr]And between, that "a special committee formed by the engineer and philanthropist Sam Zughayyar president, technical and membership of Sabah Nasser Badr follow-up and supervision of the project."[/ltr]
    [ltr]It is noteworthy that the province of Maysan experiencing multiple projects for the development of the electricity sector, with the notable stability in the voltage across the Mahafezh.anthy 29 / A 43[/ltr]


    [ltr][You must be registered and logged in to see this link.]
    [/ltr]

      Current date/time is Fri 17 May 2024, 1:17 am