Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    Al-Kazemi inaugurates the Maysan investment complex for the production of electric power

    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 269332
    Join date : 2012-12-21

    Al-Kazemi inaugurates the Maysan investment complex for the production of electric power Empty Al-Kazemi inaugurates the Maysan investment complex for the production of electric power

    Post by Rocky Sun 03 Jul 2022, 4:38 am

    [size=35][size=35]Al-Kazemi inaugurates the Maysan investment complex for the production of electric power[/size]
    [You must be registered and logged in to see this link.]
    [/size]

    Policy

    [size][size]
    [You must be registered and logged in to see this link.][/size]
    2022-07-03 | 02:42
    [You must be registered and logged in to see this image.]


    [/size]

    Source:
    [You must be registered and logged in to see this link.]

    1,428 views


    Today, Sunday, Prime Minister Mustafa Al-Kazemi inaugurated the Maysan investment complex for the production of electric power.


    Al-Kazemi said in a speech during the opening: "This station constitutes a qualitative addition to providing electrical energy in all our governorates, and that the province of[You must be registered and logged in to see this link.]It will be the first beneficiary.”

    The Prime Minister added that "the qualitative development in this station will help reduce dependence on imported gas; As it operates on locally produced gas, it will feed[url=https://www.alsumaria.tv/Entity/119488/%D8%A7%D9%84%D8%B4%D8%A8%D9%83%D8%A9 %D8%A7%D9%84%D9%88%D8%B7%D9%86%D9%8A%D8%A9/ar/]national network[/url]more electricity production.



    [You must be registered and logged in to see this link.]


    It is noteworthy that the station[You must be registered and logged in to see this link.]The combined cycle investment for electric power production will add 750 megawatts to the production[url=https://www.alsumaria.tv/Entity/119488/%D8%A7%D9%84%D8%B4%D8%A8%D9%83%D8%A9 %D8%A7%D9%84%D9%88%D8%B7%D9%86%D9%8A%D8%A9/ar/]national network[/url]Under normal operating conditions, 500 of them are through the simple cycle, and 250 of them are through the combined cycle. It uses modern technologies that reduce energy waste and are environmentally friendly. The plant operates on natural gas from the Halfaya and Bazargan fields, both in the governorate[You must be registered and logged in to see this link.]It is located in the Al-Kahla district, south of the city of Al-Amarah, in the governorate[You must be registered and logged in to see this link.].

      Current date/time is Thu 02 May 2024, 3:47 am