Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    Iraq raises oil production in the field of Zubayr to 475 thousand barrels per day

    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 270023
    Join date : 2012-12-21

    Iraq raises oil production in the field of Zubayr to 475 thousand barrels per day Empty Iraq raises oil production in the field of Zubayr to 475 thousand barrels per day

    Post by Rocky Thu 10 May 2018, 2:37 am

    [ltr]Iraq raises oil production in the field of Zubayr to 475 thousand barrels per day[/ltr]
    [ltr]Economie[/ltr]
     Since 2018-05-09 at 12:15 (Baghdad time)
    [ltr][You must be registered and logged in to see this image.][/ltr]
    [ltr]Follow - Mawazine News[/ltr]
    [ltr]An Iraqi oil official said on Wednesday that Iraq raised oil production in the field of Zubayr of the company Eni in the south by 50 thousand barrels per day to 475 thousand barrels per day.[/ltr]
    [ltr]"Production has increased after the completion of a crude processing facility," said Engineer Muhannad Abbas, director of the Zubayr field project, on the sidelines of the inauguration of oil minister Jabbar al-Laibi.[/ltr]
    [ltr]Zubayr's production capacity will gradually increase to 625,000 bpd with the addition of three other processing plants, Abbas said, but did not specify the timetable for completion.[/ltr]
    [ltr]is over[/ltr]


    [ltr][You must be registered and logged in to see this link.]
    [/ltr]

      Current date/time is Tue 14 May 2024, 12:26 am