Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    Al-Emaar: Implementing the water sector automation project in eight governorates

    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 269033
    Join date : 2012-12-21

    project - Al-Emaar: Implementing the water sector automation project in eight governorates Empty Al-Emaar: Implementing the water sector automation project in eight governorates

    Post by Rocky Mon 15 Jan 2024, 5:19 am

    Al-Emaar: Implementing the water sector automation project in eight governorates

    [You must be registered and logged in to see this image.]



    [You must be registered and logged in to see this link.] [You must be registered and logged in to see this link.] [You must be registered and logged in to see this link.] [You must be registered and logged in to see this link.]



    Economy News _ Baghdad
    At the beginning of this year, the Ministry of Construction, Housing and Public Municipalities began implementing the electronic water safety system in cooperation with UNICEF, while completing nearly half of the water sector automation project in the country.
    The Director of Water at the Ministry, Engineer Ammar Al-Maliki, told Al-Sabah, followed by Al-Iqtisad News, that his directorate, in coordination with UNICEF, began at the beginning of this year a project to implement an electronic water safety system in 15 governorates, indicating that this was done through a system for transferring data on test results. Which is conducted in laboratories belonging to the water directorates in the governorates and simultaneously to the public laboratories in Baghdad, after which the results of physical, chemical and bacteriological tests begin to be audited and monitored on a daily basis. In the same context, he stated that the water sector automation project has been implemented since 2019 and includes a complete transition from manual handling to paper and electronic collection, through the installation of water meters, pointing out that the directorate has completed about half of the project in 8 governorates: Baghdad, Holy Karbala, Najaf Al-Ashraf, and Diyala. Kirkuk and Nineveh, in addition to the governorates of Muthanna and Basra, 
    In addition, Al-Maliki confirmed that the technical staff of the Directorate have so far installed 500 standards in the governorates that have witnessed its implementation, stressing at the same time that automation works to reduce consumption and wasteful use of water, in addition to eliminating financial and administrative corruption, since the dealings will be exclusively electronic.
     



    Views 42
    Added 01/15/2024 - 9:10 AM
    [You must be registered and logged in to see this link.]

      Current date/time is Sat 27 Apr 2024, 12:10 pm