Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    Saudi Arabia expects to operate the electrical interconnection project with Iraq by the end of 2025

    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 266471
    Join date : 2012-12-21

    Saudi Arabia expects to operate the electrical interconnection project with Iraq by the end of 2025 Empty Saudi Arabia expects to operate the electrical interconnection project with Iraq by the end of 2025

    Post by Rocky Thu 08 Jun 2023, 4:41 am

    POSTED ON[You must be registered and logged in to see this link.] BY [You must be registered and logged in to see this link.]

    [size=52]Saudi Arabia expects to operate the electrical interconnection project with Iraq by the end of 2025[/size]

    [size=45][You must be registered and logged in to see this image.]
    2023-06-07
    Saudi Arabia expects to operate the electrical interconnection project with Iraq by the end of 2025[/size]
    [size=45][You must be registered and logged in to see this link.]

      Current date/time is Mon 18 Mar 2024, 9:21 pm