Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    Oil completes a number of vital projects and rehabilitates 90% of the liberated areas pipelines

    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 268963
    Join date : 2012-12-21

    Oil completes a number of vital projects and rehabilitates 90% of the liberated areas pipelines Empty Oil completes a number of vital projects and rehabilitates 90% of the liberated areas pipelines

    Post by Rocky Thu 18 Mar 2021, 7:46 am

    Oil completes a number of vital projects and rehabilitates 90% of the liberated areas pipelines

    •  Time: 03/18/2021 08:06:40
       
    •  Read: 1,989 times

    [You must be registered and logged in to see this image.]
      
    {Baghdad: Al Furat News} The staff of the (Pipeline Company) of the Ministry of Oil announced the completion of a number of vital projects to ensure the delivery of oil and their derivatives to consumer sites, especially electric power plants, in addition to the rehabilitation of 90 percent of the pipelines in the liberated provinces, which Destroyed during the control of ISIS terrorist gangs.
    Al-Mukhtasar al-Mufid .. In important news, you can find it on the Al Furat News channel on the Telegram .. [You must be registered and logged in to see this link.]
    The spokesman for the Ministry of Oil, Assem Jihad, said in a press interview, "The staffs of the (Pipeline Company) established a complex network that surrounded the oil installations to ensure maneuvering and meet consumption needs as quickly as possible. Great achievements that would lead to the delivery of networks to all consumer sites, including a number of electrical stations.
    He added, "The company’s staff has succeeded in delivering dry gas material through the pipeline system to the Qayyara electrical station, in addition to delivering the dry gas pipeline to the crutch power station, which is one of the important and large vital projects due to the difficult geography of the region and the security situation."

    [You must be registered and logged in to see this link.]

      Current date/time is Fri 26 Apr 2024, 3:57 pm