Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    Industry Announces Direct Launching of Pilot Works for Plumbing and Molding Lines

    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 280906
    Join date : 2012-12-21

    Industry Announces Direct Launching of Pilot Works for Plumbing and Molding Lines Empty Industry Announces Direct Launching of Pilot Works for Plumbing and Molding Lines

    Post by Rocky Sun 16 Jul 2017, 6:40 am

    Industry Announces Direct Launching of Pilot Works for Plumbing and Molding Lines

    economy Since 2017-07-16 at 13:38 (Baghdad time)

    Baghdad Mawazine News
    The Ministry of Industry and Minerals announced on Sunday that the General Company for the manufacture of cars and its equipment will carry out the experimental operation of the plumbing and molding lines, which was set up after being equipped with the latest equipment and equipment from Italian BeIIoi.
    The company's general manager Adnan Ahmed Razein said in a statement to the company that "the technical and engineering cadres embarked on the pilot operation of the plumbing and molding lines project, which was established after the installation of the latest equipment and equipment from BeIIoi Italian."
    He added that "the cost of the project amounted to (4, 670 000) euros within the investment plan set by the company for the purpose of developing and modernizing its plants and production lines in order to increase production and maximize its financial resources."
    He pointed out that "the production capacity of this project, which is expected to open in the next few days (300) tons per year for different types of iron and nonferrous castings," adding that "the production capacity of the line of the charge (50) pieces per hour, (80) kilograms. "
    He stressed that "these lines work with the latest specifications of the foundries, which contributes to fill the need of public and private sector companies of various castings."

    [You must be registered and logged in to see this link.]

      Current date/time is Sun 17 Nov 2024, 8:49 am