Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    Iran Starts Pumping Oil from Azar Joint Oilfield

    jedi17
    jedi17
    Moderator
    Moderator


    Posts : 10738
    Join date : 2013-02-20

    Iran Starts Pumping Oil from Azar Joint Oilfield Empty Iran Starts Pumping Oil from Azar Joint Oilfield

    Post by jedi17 Sat 18 Mar 2017, 6:14 pm

    Iran Starts Pumping Oil from Azar Joint Oilfield
    March 18, 2017 in Iraq Oil & Gas News
    Iran on Tuesday, March 14, began pumping 15,000 barrels/day of crude oil from Azar Oilfield which it shares with Iraq.

    Early production from the field, located in the border city of Mehran, began in a ceremony held in the presence of Iranian Minister of Petroleum Bijan Zangeneh.

    Azar Oilfield development project is aimed at production of 65,000 b/d of crude oil.

    Crude oil recovery from the field will double during spring and reach the envisioned 65,000 b/d by the end of the next calendar year to late-March 2018.

    Azar structure is an asymmetric anticline located in the Anaran exploration block in the foreland basin of the Zagros fold and thrust belt along the Iran-Iraq border. Total length of the field (on top of Ilam Fm.) is more than 36.5 km including the extension in Iraq, approximately 13.5 km on the Iranian side.

    The development plan of the project totally consists of drilling 19 wells during 55 months as well as designing and constructing required surface facilities, separation units and transferring pipelines.

    Azar, shared by Iran and Iraq, is estimated to hold 2.5 billion barrels of oil in place.

      Current date/time is Sat 16 Nov 2024, 4:50 pm