Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    Productive sectors waiting for their share of electric power

    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 280892
    Join date : 2012-12-21

    Productive sectors waiting for their share of electric power  Empty Productive sectors waiting for their share of electric power

    Post by Rocky Wed 23 Oct 2013, 3:41 am

    Productive sectors waiting for their share of electric power

    10/23/2013 12:00 AM

    Having settled 24 hours a day

    BAGHDAD - Farah pumice

    Analysts had expected the possibility of activating the productive sectors of the agricultural or industrial or service, the founders of this impression on the background of the recent improvements on the electric power by increasing the hours of processing in most provinces and cities in Iraq for up to 24 hours a day.

    As they saw it gives positive results reflected the effects on all segments of society and thus alleviating the suffering and increase their ability to give.

    Economic expert on behalf of Jamil Antoine said in a statement (morning): The improvement of electric power will be a catalyst for activating the agricultural sector and a lot of industrial projects that powered what leads to the operation of labor and reduce the unemployment rate, as well as it would ease the suffering of the citizens and the improvement of the psyche and increase ability to tender.

    Antoine said provided will ease the burden of the citizen pay wages generators, hello Baghdad Provincial Council decision to reduce the price of electricity for AMP generators which reduces the burden on the citizen.

    The Baghdad Provincial Council has set the price amps three thousand dinars for generators government and five thousand dinars for civil for two months next two years, as well as forcing the owners of generators to deport the amounts paid by the citizens during the past month and present to the coming months as compensation for non-operating coincide with improved processing power.

    Reduce costs

    The expert pointed out that he will activate a lot of projects and laboratories as a result of energy-saving, as it will work with all its energy, which reduces production costs with the possibility of competing goods and foreign goods, pointing out that provided for the employee will contribute to increasing the speed of completion of transactions, especially as a lot of departments do not where electric power is available during office hours.

    He noted Antoine that next June will be the country's semi-sufficient electric power, especially with a lot of power plants new in several provinces and cities including Wasit and Mosul, architecture and others are all ready for action and production and all you need is to save fuel, as well as expansion in the completion of other stations the contribution of the private sector in this field by 3000 MW is in the process of signing contracts with the relevant authorities, as the current production of electric power approximately 11 thousand megawatts, urged not to stop construction of new plants, especially since the old plants need to rehabilitate.

    Low consumption

    In turn, called the consultant in industrial development and investment expert Amer Issa Jeweler Ministry of Electricity to accelerate the increase in production capacity in order to meet the need, which will increase in the coming winter, as well as the need for economic sectors, particularly industrial energy into electrical energy big, especially as the production as consumption during Afattrhalhalah, any The months of September and October have two low consumption to a minimum.

    The biggest challenge

    He noted jeweler in his statement (morning) to the need to speed up the increase in production of electric power, since the following is the biggest challenge, he says, pointing out that current production will not meet the need of factories and private large factories, as it assumes uninterrupted electrical power from each other.

    He urged the expert and the Ministry of Electricity to develop a mechanism for the operation of lighting lamps in the streets, contribute to energy conservation, because there is a lot of these lamps work during the day, what leads to the consumption of greater ones, as well as the work of awareness-raising campaigns continuing to reduce the waste of electrical energy, suggesting that the pricing of electric power supplied to factories and laboratories supported by offering encouragement and activate her work.

    [You must be registered and logged in to see this link.]
    [You must be registered and logged in to see this image.]

      Current date/time is Sat 16 Nov 2024, 11:59 am