Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    After rehabilitation .. Resume production from the field, "Ajil" oil

    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 280892
    Join date : 2012-12-21

    After rehabilitation .. Resume production from the field, "Ajil" oil Empty After rehabilitation .. Resume production from the field, "Ajil" oil

    Post by Rocky Sun 11 Mar 2018, 1:30 am

    [ltr]After rehabilitation .. Resume production from the field, "Ajil" oil[/ltr]
    [ltr]Economie[/ltr]
     Since 2018-03-10 at 17:42 (Baghdad time)
    [ltr][You must be registered and logged in to see this image.][/ltr]
    [ltr]Baghdad - Mawazine News[/ltr]
    [ltr]Oil Minister Jabbar al-Allaibi confirmed on Saturday the resumption of production of oil and gas from the field "Ajil" oil, in the province of Salah al-Din after the completion of the first phase of the rehabilitation work.[/ltr]
    [ltr]Al-Luaibi said in a statement read by Mawazine News that "the rehabilitation and rehabilitation work included extensive damage to the field's installations and wells during the control of a terrorist organization in the area of ​​Saladin province."[/ltr]
    [ltr]He added, "The operation of the experimental operation of the field, after the completion of the rehabilitation and linking of a number of oil wells, with production rates starting from 5 thousand barrels per day up to 17 thousand barrels."[/ltr]
    [ltr]The security forces regained control of the Ajil field, which produced about 35,000 barrels of oil a day, in March 2014, after about a year of control over it.[/ltr]


    [ltr][You must be registered and logged in to see this link.]
    [/ltr]

      Current date/time is Sat 16 Nov 2024, 6:31 pm