Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    Inspector electricity: the need for 10 years to reach full sufficiency of energy

    chouchou
    chouchou
    Moderator
    Moderator


    Posts : 5059
    Join date : 2012-12-20

    Inspector electricity: the need for 10 years to reach full sufficiency of energy Empty Inspector electricity: the need for 10 years to reach full sufficiency of energy

    Post by chouchou Thu 01 Aug 2013, 7:03 am

    [You must be registered and logged in to see this image.]

    Said inspector general of the Ministry of Electricity to equip citizens powered stable and the clock will only be achieved after ten years from now if the continuation of the ministry performed by the current, pointing to continue to investigate the 17 dossier was referred to the Office of the Integrity Commission concerning the duration استيزار former minister Dr Karim single.

    Real numbers

    Promised inspector general of the ministry, Engineer Alaa Muhyiddin told (Center Brief for the Iraqi Media Network) rates of energy production announced by the ministry, is a real being will depend on what is achieved from the energy produced in an hour peak load, noting that there is a difference between peak load and the rate of energy produced An estimated 1,000 MW, indicating that the peak load is just a pointer to the performance of generating units and is not a reliable measure of the power output.

    He added that the concerned authorities in the ministry to submit a report every day to remember the production of peak load manufacturer, distributor less than that 1000 MW and the difference between peak and pregnancy equipped with what is misleading Besides the presence of large quantities of energy is imported, which was discovered by the Prime Minister, confirming the presence of improvement the performance of the stations as a result of the entry of new units, the largest production of the past years, however, that the improvement of the citizen does not appear due to increased consumption.

    He said Muhyiddin that the ministry is moving slowly towards improving the situation of the electrical system, pointing out that access to the complete stability in the system without cutting the programmer needs to for 10 years because the problem faced by the ministry is not limited to production the fact that the ministry has signed new contracts to build power stations in order to increase production, adding that the increase in the volume of production and availability of energy requires a mechanism to move it to the consumer pass through the networks of power transmission and distribution networks, which is currently experiencing a lot of bottlenecks large due to the presence of financial and administrative corruption and disrupt the work of companies discreet on the establishment of secondary stations result of blackmail and Msawmtha a view to obtaining commissions including what leads to get the electricity grid bottlenecks which reflected negatively on the processing power citizens.

    YUSUFIYA Station

    And on the station Yusifiyah, said the inspector general said the ministry has contracted several years ago with a Russian company for the completion of the station, however, that the project encountered a number of Alashklat result of an exchange of accusations between the Russian company and the ministry of stalling and repudiation of contractual obligations, noting that there are a lot of observations recorded by the ministry's work Russian company which is incorrect because the company has not fulfilled its obligations, stressing that his office has not yet completed any investigation Concerning YUSUFIYA Plant.

    He revealed inspector general of electricity that his office is investigating 17 file assignee him from the Integrity Commission a private state of former Minister Karim Waheed, not in person, but emerged during questioning by the House of Representatives, noting that the office was completed file to hold ديزلات (Hyundai), which detect waste of money year, up to $ 104 million is summoned from the office referred recently to the Integrity Commission, in addition to checking the file for four stations Links monument signed contracts in 2008 and was scheduled to enter work in the same year after the ministry asked the exception of the Council of Ministers, but these stations entered the work in 2012, noting that the term next few will see the completion of this file to be possible to submit it to the Integrity Commission. between that one of the biggest problems faced by office assignment files on the Integrity Commission as one of the dilemmas plaguing because the process of referral done on Integrity Commission require authentication and Minister of Electricity him and who has an opinion given on the validation of the recommendations, since most of the recommendations made by the Office of the Inspector General to the Minister is currently disabled, and a certain percentage of them rejects the majority postponed, forcing the office to inform the Integrity Commission the results of investigations and reporting the inability to obtain the Minister authentication thereon.

    Fuel processing

    And health news issued by the ministry on obstructing regulators processing stations with fuel, he noted Muhyiddin said the ministry in case I decided to examine the fuel connecting to the terminals, the Office of the Inspector General have a representative as an observer for the inspections and that it stopped in recently, pointing out that the minister baptized recently to set up committees to examine in Basra, where representatives from the Office of the Inspector General. pointed to fulfill the Oil Ministry obligations direction of the Ministry of Electricity as it proceeded during the last term to provide the agreed quantities of fuel, gas oil, "kerosene" to run the stations, according to the agreement between the two ministries and by three thousand cubic meters of material a day, explaining that the oil ministry proceeded to increase the quantities processed for plants up to 7000 cubic meters per day recently, where managed to double the fuel supplier for the stations, indicating that the need for the Ministry of Electricity of which is estimated at 11 thousand cubic meters, which invites them to provided alternative fuels. said inspector general of electricity that the oil ministry is unable to provide gas as fuel for the stations because of a technical problem, so he proceeded to be compensated through the provision of alternative fuels, which told the oil ministry of electricity that there is no possibility of providing gas for power stations in the quantities required for technical reasons, pointing out that the oil demanded power to modify some of the stations that could run on alternative fuels to ensure continued operation. noted that the Ministry of Oil proceeded to import fuel on the work of electric power stations, especially gas oil, but the processes modulating some power stations and reliance on alternative fuels is not possible and it The Ministry of Electricity proceeded recently contracted with the Iranian side to import gas, including through the system pipes up to southern and central regions to ensure the operation of a number of power stations that can not be adapted to alternative fuels, stressing that the quantities imported from Iran would fill the shortfall of fuel and run power stations, pointing out that the lack of gas cause the loss amounted to only 200 MW.

    Organization of robberies

    And on the theft of fuel connecting stations, said Muhyiddin said theft that affect the fuel for processing units obstetric are inside the stations equipped itself was not brought under control this phenomenon, although the Office of the Inspector General made considerable progress in this subject, as it is still smuggling fuel stations continuously claim that remnants of the station, a style common in a large number of stations Baghdad and the provinces.

    He revealed that his office recently agreed with the Integrity Commission to overcome the problem of the lack of validity of a lawsuit to arrest on the tank that holds the fuel stolen, as was the office adjusts constantly similar situations then ask the directorate concerned attendance to the presence of legal personality legal to اتتوفر of the Office of the Inspector General the possibility of arrest of the person concerned, noting that these measures require a lot of time, which helps the driver to escape or leaking fuel, noting that the office coordinated with the Integrity Commission to adjust the cisterns and the arrest of drivers and take legal action against them before I am.

    Inspector general of electricity between that office presented a proposal to the government to overcome the shortage of fuel includes imported directly from the ranks of working-class standard, noting the existence of these refineries in the Gulf states, which pose quantities of clean fuel standard specifications, indicating that the proposal provides also leased tankers to load fuel directly from the refinery through down to the Gulf of Basra, including the ministry ensures that amounts best and finest quality.




    [You must be registered and logged in to see this link.]

      Current date/time is Tue 07 May 2024, 11:16 pm