Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    Thanks to the spirit of cooperation and joint work, the distinguished technical and engineering staf

    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 278239
    Join date : 2012-12-21

    Thanks to the spirit of cooperation and joint work, the distinguished technical and engineering staf Empty Thanks to the spirit of cooperation and joint work, the distinguished technical and engineering staf

    Post by Rocky Sun 10 Dec 2017, 3:51 am

    Thanks to the spirit of cooperation and joint work, the distinguished technical and engineering staff of the oil pipeline company is racing against time
    [You must be registered and logged in to see this image.]
    [You must be registered and logged in to see this link.][You must be registered and logged in to see this link.][You must be registered and logged in to see this link.]2017-12-10
    All News / Bahaa Al - Jabri
    Under the direct supervision of the Director General of the Petroleum Pipelines Company and based on the directions of the Agent for the extraction of the technical and engineering staff started from the maintenance of pipelines will contribute to start loading crude oil from one warehouse in June quantities of up to 50 thousand barrels per day, a new port for loading by cars pelvic . 
    Continued field visits to work sites rehabilitation of oil pipelines
    The workshop was attended by Mr. Hussein Khalaf Hassan, Director of the Occupational Health and Safety and Environment Authority, Head of the Operations Room, Mr. Ashour Abdul Sada Kazem, Director of Pipe Maintenance Department, Pipeline Pipeline Company. ), The link between the tanks K1 and one warehouse in June, where the supervision of the hydrostatic inspection of the pipeline after the completion of all the work of linking and welding and filling the pipeline with crude oil in a record period and with high accuracy by our technical and engineering staff working at the site ... Other Dania to p t / 1 station to oversee the examination of the tube (26) knots dry gas from the TM / 1 station and even kilometer (26) to determine the damaged sites of the pipeline to be repaired .. Work is continuing to complete the required tasks on time.
    The work was also done on the pipeline (10) knots, which reached the final stages thanks to the efforts of cadres working on this tube and was also seen on the caravans allocated to the members of the Qurna battalion / energy police located to protect the tracks of oil pipelines. 26) a node in preparation for the preparation in accordance with the directives issued by the Ministry and the ongoing field follow-up by the Chamber of Operations problem in this regard. 
    Rehabilitation of pipelines transporting oil to work sites
    In addition, the pipelines of crude oil have been rehabilitated to the work sites to carry out the works that have been completed and record period thanks to the spirit of cooperation and joint work that characterized the working cadres of the North Oil Company and the oil pipelines ... The visit also included the work sites on the Iraqi- ) Node and line (26) contract to supervise the conduct of the rehabilitation of the lines of the search and see the work of lifting and unloading IEDs planted by gangs and a terrorist on the tracks of oil pipelines.



    [You must be registered and logged in to see this link.]

      Current date/time is Sat 28 Sep 2024, 12:05 pm