Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    Mosul Airport.. Airports Administration is examining the final designs for air navigation systems

    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 269932
    Join date : 2012-12-21

    Mosul - Mosul Airport.. Airports Administration is examining the final designs for air navigation systems Empty Mosul Airport.. Airports Administration is examining the final designs for air navigation systems

    Post by Rocky Fri 01 Mar 2024, 4:10 am

    POSTED ON[You must be registered and logged in to see this link.] BY [You must be registered and logged in to see this link.]

    [size=52]Mosul Airport.. Airports Administration is examining the final designs for air navigation systems[/size]

    [size=45]The Airports and Air Navigation Administration discussed the final designs of air navigation systems at Mosul Airport.[/size]
    [size=45]The Ministry of Transport said in a statement, “The General Company for Airports and Air Navigation Management/Aviation Communications Department held an expanded meeting headed by the Department Director, Ali Salah Mahdi, with a delegation that included a representative from the Nineveh Governorate Office, Planning Director, Azhar Taha Qasim, and the engineering staff in charge of implementation work at Mosul International Airport.” .[/size]
    [size=45]The Director of the Communications Department explained - according to the statement - that “the meeting highlighted the discussion of the final designs for air navigation systems and overcoming the obstacles facing the process of rehabilitating the airport,” pointing out that “the most prominent outcome of the meeting was approaching the Nineveh Governorate Office on some technical observations, confirming them, and working on them.” “By the governorate, as it is the body responsible for the airport’s implementation.”[/size]
    [size=45]He added, "The meeting was held based on the directives of the Minister of Transport, Razzaq Muhaibas Al-Saadawi, and the Director General of the Airports Administration, Abbas Al-Baidhani, which stipulated that airports be given the utmost importance, coinciding with the receipt of their management file by the Ministry to improve the level of services provided there[/size]
    [size=45][You must be registered and logged in to see this link.]

      Current date/time is Sun 12 May 2024, 6:17 am