Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    Three-year plan for the reconstruction of Anbar electricity

    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 280892
    Join date : 2012-12-21

     Three-year plan for the reconstruction of Anbar electricity Empty Three-year plan for the reconstruction of Anbar electricity

    Post by Rocky Tue 09 Feb 2016, 3:52 am

    [You must be registered and logged in to see this image.] Three-year plan for the reconstruction of Anbar electricity
     By: [You must be registered and logged in to see this link.]
    date: Tuesday 02.09.2016 0:22


    Baghdad / Baghdad news 
    announced that the Ministry of Electricity, develop plans to restore power in areas liberated in the Anbar province of Daash terrorist gangs. A spokesman for the Electricity Minister Mohammad Fathi's office in a statement: "Baghdad News" received a copy of it, he was "in conjunction with the progress of the security forces and achieve victories in Anbar province, the Electricity Minister Qassim Fahdawi Directorate-General for the transfer of electrical energy for the upper Euphrates implementation necessary for the restoration of electricity to the liberated areas plans. " He pointed out that" the Directorate General of electric power transmission Supreme Euphrates region has developed a three-phase plan to restore lines and stations power transmission to the province after coming under massive destruction. " among Fathi that" the first stage, a short-term plan includes a monument mobile stations and repair the damage lines tanker electric power, which will feed the city of Ramadi immediately after liberation of Fallujah and the city of Hit as containing the major exporters to feed the city of Ramadi, a Fallujah station 132 kV Substation and 132 kV Heat, which is still under the control of Daash terrorist gangs. " he said he" was planned to find an alternative feed and tap a line of western Baghdad station 400 KV through a conversion between latitudes (Haditha, west of Baghdad ) 400 kV and (east of Ramadi, Fallujah) 132 kV and take advantage of parts of the two lines, but some tracks for the two lines (within the regions of the vine) is still under the control of terrorist Daash gangs. " spokesman and Minister of Electricity Office," The second phase a medium-term plan will include repairing a transformer of (63MVA) in the old gray station 132 kV and some feeders 33 kV and the damage to the lines carrier in addition to the monument mobile terminals within the first phase of the plan, and this is also linked to the provision of energy source by editing the cities of Fallujah or the Heat or the vine in full. " He pointed out that Fathi" The third stage is a long-term plan would be to erect a new manufacturing plant of 132 KV and repair the complete destruction of the new gray stations. 132 KV station and the old gray 132 kV. " and that" this plan and the three phases linked to the liberalization areas of hit, Fallujah, some vine areas to the presence of the main feeder to the city of Ramadi, sources in these areas and now will run Dezlat Ramadi in nationalization region and parts of which were to sabotage work is also underway on the operation of the remainder, which can provide electrical power for some projects water and hospitals. "


    [You must be registered and logged in to see this link.]

      Current date/time is Sat 16 Nov 2024, 1:57 pm