Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    The introduction of new high power station to work architecture

    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 280381
    Join date : 2012-12-21

     The introduction of new high power station to work architecture Empty The introduction of new high power station to work architecture

    Post by Rocky Thu 07 Jul 2016, 3:18 am

    The introduction of new high power station to work architecture


    [You must be registered and logged in to see this link.]



    Maysan electricity distribution directorate announced the introduction of transformative substations new work city architecture center.  
    The director of the department Engineer Jassem Radi my reporter for the Iraqi News / nina / National Agency: "The Maysan new secondary plant project was carried out by the company (Siemens) German" Japanese loan " it was introduced to work after processing nutrients (11 k. F.) for its neighboring areas."  
    He added that the project was implemented during / 24 / month and will unzip the bottlenecks in the areas surrounding theplant.



    [You must be registered and logged in to see this link.]

      Current date/time is Thu 07 Nov 2024, 2:55 am