Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    Minister of Transport, "the news": No problems in the implementation of the first stages of the port

    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 270229
    Join date : 2012-12-21

    Minister of Transport, "the news": No problems in the implementation of the first stages of the port Empty Minister of Transport, "the news": No problems in the implementation of the first stages of the port

    Post by Rocky Tue 16 Jul 2013, 5:06 am

    Minister of Transport, "the news": No problems in the implementation of the first stages of the port of Faw



    16-07-2013 05:57 AM
       

    Baghdad (news) .. The Minister of Transport Hadi al-Amiri, said the first stages of the establishment of the port of Faw is going according to plans drawn and its stomach, indicating the absence of any problems facing this stage.

    Amery said in an exclusive interview with the Agency (news): The initial stages of the port of Faw is not where any problems so far, noting that work on the first phase being drawn according to plan and as sanctioned and put up by the Italian designer of the port.

    Ameri continued: he has been pulling the port to the point where it does not affect the Kuwaiti port of Mubarak it, but the port of Mubarak affect the ports remain current Iraqi port of Umm Qasr, southern and northern and Khor Al-Zubair.

    The Ministry of Transportation and placed in the (April 2011 past) foundation stone for the port of Faw, which indicates his designs basis to fit the container terminal length of 39 thousand square meters and a berth last a length of 2000 meters, as well as an arena for containers with an area of ​​more than one million m 2 and another arena multi-purpose area 600 A m 2 as an absorptive capacity of the port of 99 million tonnes per annum in total cost for the establishment of four billion and 400 million euros and it is hoped that the connection port line railway connects the Persian Gulf through Iraqi ports in northern Europe through Turkey. / End / 3. h. P /


    [You must be registered and logged in to see this link.]

      Current date/time is Fri 17 May 2024, 12:24 am