Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    Electricity entered into a contract with the company, "GE" for the operation south of Baghdad, the

    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 270411
    Join date : 2012-12-21

     Electricity entered into a contract with the company, "GE" for the operation south of Baghdad, the  Empty Electricity entered into a contract with the company, "GE" for the operation south of Baghdad, the

    Post by Rocky Wed 28 Dec 2016, 3:06 am

    [size=30]Electricity entered into a contract with the company, "GE" for the operation south of Baghdad, the second gas station[/size]
    28/12/2016 10:21 | Number of Views: 26
    font size: [You must be registered and logged in to see this image.] [You must be registered and logged in to see this image.]
    [rtl]Direction Press / Baghdad[/rtl]
    [rtl]It struck the Ministry of Electricity, represented by the Directorate-General for the production of electrical energy, in the central region, a contract with the US General Electric Company, for the maintenance and operation of the second gas station south of Baghdad.
[/rtl]
    [rtl]A ministry spokesman, Musab teacher, in a statement on Wednesday got "direction Press" a copy of it, that " the contract includes processing, installation and operation (8) generating units of gas type ( Frame 5 ), in thesecond south of Baghdad gas station, card design of $ (26.2 MW) per unit, as part of the US loan and theduration of the implementation of (300 days), to add to the national electricity system capacity of 209 MW. "
[/rtl]
    [rtl]He continued that "the implementation of this contract will contribute to the national system Brphi new obstetric cards, thus reducing the hours[/rtl]

    [rtl][You must be registered and logged in to see this link.]
    [/rtl]

      Current date/time is Mon 20 May 2024, 1:02 am