Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    Electricity bear responsibility for the low oil production capacity for goods gas power station

    chouchou
    chouchou
    Moderator
    Moderator


    Posts : 5062
    Join date : 2012-12-20

    Electricity bear responsibility for the low oil production capacity for goods gas power station Empty Electricity bear responsibility for the low oil production capacity for goods gas power station

    Post by chouchou Sun 08 Sep 2013, 12:01 pm

    [You must be registered and logged in to see this image.]

    {Baghdad: Euphrates News} carried the Ministry of Electricity counterpart responsible for the low oil production capacity to a power station soft goods because of the failure to provide natural gas to them.


    [ltr]Said the spokesman of the Ministry of Electricity Musab teacher in a statement issued by the Ministry of Electricity received by the agency {Euphrates News} copy of it on Sunday that "the Angels Engineering and Technical Directorate networks electricity Babylon completed its own tests final for power transmission lines and stations manufacturing, to connect the two units Altolidetyn ninth and tenth for goods gas power station of the national electricity system in preparation for the entry into service early next week. "[/ltr]


    [ltr]He added that "goods gas power station in the holy city of Karbala, from generating stations of projects for the Ministry of Electricity and the Turkish جالك company implemented".[/ltr]


    [ltr]He said the teacher that "the station goods gas consists of ten modules obstetric, and design capacity per unit {125} MW, and a total capacity of {1250} megawatts, works are currently eight units with a capacity of {600} MW, the fact that these units and due to the lack of natural gas by the Oil Ministry, is currently working alternative fuel, as the four units were operating بالكاز Oil, and four other units operate black oil, which has a negative impact on low productive capacity of these units. "ended[/ltr]

    [ltr][You must be registered and logged in to see this link.]
    [/ltr]

      Current date/time is Mon 18 Nov 2024, 3:54 pm