Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    Wasit sulfur production starting from the Ahdab oil field

    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 278777
    Join date : 2012-12-21

    Wasit sulfur production starting from the Ahdab oil field Empty Wasit sulfur production starting from the Ahdab oil field

    Post by Rocky Sat 28 May 2016, 5:37 am

    [ltr]
    Wasit sulfur production starting from the Ahdab oil field

    May 28, 2016


    [size=13][size=14][You must be registered and logged in to see this link.]
    [/size]
    [/ltr][/size]
    [ltr]
    [You must be registered and logged in to see this link.]
    Our economy / Wasit
    Wasit Provincial Council announced on Saturday, for the start of sulfur production for the first time in the Ahdab oil field, west of Kut, and as promised, this production will enhance the national industry's capacity, revealed that the rate of oil production from the fields of humpback and Badra totaled 200 thousand barrels per day.
    The head of the Energy Committee in the House of Wasit province, hoping Ugaili said in a statement seen by the agency of our economy News, "The Angels oil operating in the Ahdab oil field, (23, west of Kut) km, managed first time, the production of sulfur and the initial capacity of 15 tons per day." indicating that "this amount of production represents the first phase of the sulfur production."
    Ugaili promised, that "sulfur production will contribute to the promotion of the national industry, the large number of industrial uses," asserting that "production is set to rise upward in the subsequent period, in addition to the exploitation associated with the production process in other areas of gas."
    She Ugaili, that "crude oil production rates from the fields of humpback and Badra increased to 200 thousand barrels per day, and by 160 thousand barrels of Ahdab and 40 thousand barrels of Badrah, from about 180 thousand barrels per day," pointing out that "my company Oasis China invested field humpback, the Russian Kazibrom invested field Badra have carried out so far drilled 200 oil wells. "
    He revealed Ugaili, that "153 wells have entered into actual production, by 13 wells in the Badra field and 140 in the Hunchback," likely "to exceed the daily production of 350 thousand barrels of oil per day, if you complete the rest of the wells and linked system of production."


    [You must be registered and logged in to see this link.]
    [/ltr]

      Current date/time is Tue 08 Oct 2024, 2:10 pm