Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    Transport reveals new information through development: high-speed trains and European operating syst

    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 281403
    Join date : 2012-12-21

    Transport reveals new information through development: high-speed trains and European operating syst Empty Transport reveals new information through development: high-speed trains and European operating syst

    Post by Rocky Mon 17 Apr 2023, 5:10 am

    Transport reveals new information through development: high-speed trains and European operating systems

    [You must be registered and logged in to see this image.]



    [You must be registered and logged in to see this link.] [You must be registered and logged in to see this link.] [You must be registered and logged in to see this link.] [You must be registered and logged in to see this link.]



    Economy News-Baghdad
    The Ministry of Transport is studying the preparation of designs for the development road, after obtaining the necessary approvals to determine the proposed routes for the road, with its two parts, the highway, and the railway line for transporting passengers and goods, from the large port of Faw to the Turkish border, with a length of 1175 km.
    And the Ministry of Transport stated in a statement that "the Minister of Transport obtained preliminary approvals to determine the tracks of the project, which tops the ministry's work priorities, as it is one of the strategic projects adopted by the ministerial program."
    He explained, "The railway line starts from the large port of Faw towards the northern regions, with a capacity in the first phase of 3.5 million containers, and 22 million tons of (random) bulk cargo," stressing that "the load will be raised in the second phase to 7.5 million containers." and 33 million tons of cargo.
    The statement indicated that "surveillance cameras will be along the road line, in addition to the presence of rest areas for passengers, and others for loading and unloading."
    He added, "The railway line will be one for transporting passengers and another for goods," noting that "a high-speed train with a speed of 300 kilometers per hour will be allocated to transport passengers, with a capacity of 13.8 million passengers annually."
    The statement added, "The second railway line will be dedicated to goods, at a speed ranging from 130 to 140 kilometers per hour, and will run on electricity," explaining that this line "will pass through about nine governorates."
    The statement pointed out that "the transportation system that will be used in the project is the European system, with the aim of continuity of the global train movement without stopping, taking into account the issue of millions of visits."
    The statement concluded that "the highway will be (To Wei) with a length of 1190 km, starting from the port of Faw and passing through the desert areas, because it is designated for trucks, and there is no need for it to enter the cities."


    Views 486
    Added 04/16/2023 - 8:40 PM


    [You must be registered and logged in to see this link.]

      Current date/time is Wed 27 Nov 2024, 5:10 pm