Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    Resources achieve advanced completion rates to increase water expenditures in the Tigris and Euphrat

    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 281403
    Join date : 2012-12-21

    Resources achieve advanced completion rates to increase water expenditures in the Tigris and Euphrat Empty Resources achieve advanced completion rates to increase water expenditures in the Tigris and Euphrat

    Post by Rocky Sun 31 Jul 2022, 4:41 am

    [size=46]Resources achieve advanced completion rates to increase water expenditures in the Tigris and Euphrates[/size]
    Iraq
    11:20 - 07-31-2022
    [You must be registered and logged in to see this image.]
    Today, Sunday, the Government Media Cell announced that it had achieved advanced rates of achievement to increase water expenditures in the basins of the Tigris and Euphrates rivers.

    The cell said in a statement, "The engineering and technical staff in the River Creek Works Department / Ministry of Water Resources within the Fallujah site, and in cooperation with the General Authority for the Operation and Maintenance of the Tigris River Basin, are continuing to implement the floating Tharthar pumping station within the work of treating water scarcity and increasing expenditures in the two basins of the Tigris rivers." Euphrates."

    She added, "The stages of work included removing sediments from the pumps basin, removing sediments from a level of (0-40) with a quantity of (45930) m3 with a completion rate of (100%), and burying it in clean soil with drying the pumps basin, strengthening the plug and burying the road from the regulator to the station in Space. With a quantity of (28,621) m3 and a completion rate of (100%), in addition to refining the sides of the canal and the pump trough with a completion rate of (100%).

    She indicated that "the works also included the removal of sediments from the main Tharthar channel, with an amount of (176912) m3, with a completion rate of 26%, and excavation works for the channel carrying the floating Tharthar station, with an amount of (549,900) m3, with a completion rate of 36%, and that the works are continuing. At an increasing pace, within what is planned," referring to "the use of specialized mechanisms, floating excavators, dredgers, standard excavators, long arm excavators, bulldozers, tippers and other supporting mechanisms."

    [You must be registered and logged in to see this link.]

      Current date/time is Wed 27 Nov 2024, 2:34 pm