Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    Basra Opens First Plastic Factory international standards

    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 281402
    Join date : 2012-12-21

    Basra Opens First Plastic Factory international standards Empty Basra Opens First Plastic Factory international standards

    Post by Rocky Fri Sep 16, 2016 3:56 pm

    Basra Opens First Plastic Factory international standards




     09/16/2016

    [You must be registered and logged in to see this image.]

    It opened a new plastics factory highest specifications in the city of Basra in southern Iraq, which produces plant, which cost more than $ 15 million in a wide range of products from plastic bags to pipes and hopes to reduce the country's need for imports.

    The factory also includes the first production line in Basra for recycled products which converts plastic waste into new products.

    Said Ali Gaspe head of the Investment Authority in Basra, said that "the factory produces all products entering the material (Alba.vi.sa) in manufactured starting from waste and medical bags, plastic pipes and agricultural plastic sheeting and houses bags," pointing out that "the project is ISO certificate the card high productivity and all production lines making him a strong contender, and perhaps can be controlled on the domestic market to maintain and possibly beyond it to the markets to other governorates. " According to Reuters.

    It has a factory primarily on four thousand square meters area of ​​the latest equipment and has four production lines.

    It can produce 25 thousand tons of plastic products used in agriculture and other industrial purposes, and about ten thousand tons of oil and sewage pipes of various sizes annually.

    Gaspe, adding that "this could be the mass production of the province of Basra to reach self-sufficiency with regard to plastic products."

    "We need to study and database for the amount of production in the preservation or other governorates Which needs to be a resolution of the General Secretariat of the Council of Ministers either preventing virtually all import plastic materials if they cover production or prevent the import rate and control of imported materials so as to enhance the local economy."

    Many of Iraq's factories and 260 factories either looted in the aftermath of the US invasion in 2003, or timeliness of, or located in regions plagued by unrest.

    But Basra has benefited from greater numbers of local and foreign investors attracted by the relative stability in southern Iraq in the past few years.

    Qais al-Khazali, says one investor Basra factory plastic "The factory is unique in the south of Iraq," adding that "the plant is the first of its kind in the province of Basra."

    He continued that "the plant, which employs at least a hundred workers to support the needs of the state to curb the influx of cheap products to the country," Please tell us that the "factory to develop a plan to increase the number of employees to a lesbian."

    The Iraqi government issued a five-year plan for economic development in 2013, it aims to diversify its sources of income away from oil and the development of the industrial sector in the country.

    The plan calls for, which stretches from 2013 to 2017 to invest $ 357 billion in development projects across the country with a focus on five key sectors are construction, services, agriculture, education, transport and communications, and energy.

    [You must be registered and logged in to see this link.]

      Current date/time is Wed Nov 27, 2024 9:01 am