Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    The increase in the hours of “programmed electrical cuts” due to maintenance and the decline of Iran

    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 270001
    Join date : 2012-12-21

    The increase in the hours of “programmed electrical cuts” due to maintenance and the decline of Iran Empty The increase in the hours of “programmed electrical cuts” due to maintenance and the decline of Iran

    Post by Rocky Sun 12 Dec 2021, 6:31 am

    [size=52]The increase in the hours of “programmed electrical cuts” due to maintenance and the decline of Iranian gas[/size]

    [size=45][You must be registered and logged in to see this image.]
     Baghdad: Tariq Al-Araji
    The Ministry of Electricity attributed the increase in the hours of programmed cut-off in the city of Baghdad and the provinces during the past few days to the decline in the quantities of gas supplied by the Iranian side, and the completion of periodic maintenance work for a large number of stations and obstetric units, while the staff in the “Baghdad Distribution Company” completed the work of lifting abuses on networks and maintenance. And lighting a number of streets on both sides of Karkh and Rusafa, as part of a major campaign that has entered its second week.
    A spokesman for the Ministry of Electricity, Ahmed Al-Abadi, said: “The past few days have witnessed a significant decline in the quantities of gas supplied from the Iranian side to Iraq, which reached nearly 8 million standard cubic meters per day, out of the agreed quantity of 50 million cubic feet.” daily record during the winter, which led to depriving the system of available amounts of energy amounting to 3,500 megawatts.”
    He added that "the other thing that led to an increase in the hours of programmed cut-offs in some areas of the capital and a number of governorates, was conducting periodic maintenance work for a large number of obstetric units, stations and distribution networks, in preparation for peak times and the actual need for energy," stressing that "the Ministry despite these challenges." And others, such as limited financial allocations, are working to make next summer the best for the electricity sector at the level of production and distribution.”
    On a related level, Al-Abadi confirmed that "the engineering and technical staff in the Rusafa Electricity Distribution Branch of the (General Company for Baghdad Electricity Distribution) carried out their campaigns by lifting abuses and maximizing the fees of collection on the Rusafa side."
    And he indicated that “the campaigns included lifting the abuses within the locality (121) in the Fadwa Arab area, and removing the abuses within the shops (143, 123,720), in addition to collecting the wages for consuming electrical energy and cutting off the electricity for those who refrain from paying wages, as well as taking written pledges not to Repeating the transgression in the future, while urging citizens to review the electricity departments to complete the transaction of delivering electricity to newly constructed buildings legally and fundamentally, and directing them to pay their previous debts.
    He explained that "the staff of the General Company on the Karkh side completed the works of transforming the installation of the media station, the lighting works and the maintenance of the electrical network." The treatment of feeding sources and maintenance of the stalks, as well as the maintenance of technical beams in the electrical network of the shops (406, 412, 617, the locality of the Volunteer Regiment Airport, 615, 412, 623, 410, 619, 619).
    Disclaimer: All published articles represent the opinion of its authors only[/size]
    [You must be registered and logged in to see this link.]

      Current date/time is Mon 13 May 2024, 6:30 am