Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    Muthanna declares stop linking manufacturing plant in Diwaniya to influence the processing of electr

    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 280553
    Join date : 2012-12-21

    Muthanna declares stop linking manufacturing plant in Diwaniya to influence the processing of electr Empty Muthanna declares stop linking manufacturing plant in Diwaniya to influence the processing of electr

    Post by Rocky Tue 08 Nov 2016, 2:49 am

    [You must be registered and logged in to see this image.]
    Muthanna declares stop linking manufacturing plant in Diwaniya to influence the processing of electricity


     Muthanna / long-Presse 

    Announced Muthanna management, Sunday, that the Prime Minister and Coordinating Body of senior office between suspended provincial linking manufacturing plant belonging to theprovince of Diwaniyah area, the carrier lines ofelectric power to the Muthanna to impact on processing power, usually the solution is the completion ofRumaitha line - Diwaniya 2 or linking station line of Diwaniyah - maize. 
    , said deputy governor of Muthanna for energy, Shaker al - Jubouri, said in an interview to the (long - Presse), " the prime minister and the bodies coordinating the upper between provinces halted manufacturing plant in the district of al - Hamza, of the province of Diwaniyah, (60 km south - east of Samawah) , because of their impact in the city in terms of processing power , "noting that" the Ministry of Electricity had intended toconnect the power plant (32-132makawat) in the district of al - Hamza written Qaddissiya - north ofSamawah, and Qaddissiya - Rumaitha to improve the electrical energy level. " 
    He said al - Jubouri, the those "studies have shown that linkage affects the amount of connecting power to the Muthanna and quality of voltages , " noting that "the Ministry of Electricity did not take into account thesuffering of the province in the areas of power generation, transmission and distribution." 
    felt the Deputy governor, that " the resolution of the issue lies the completion of Rumaitha line - Diwaniya 2 or linking the station Diwaniyah line - mays which is only 200 meters from the station , which means that thelack of influence be clear there. " It is 
    noteworthy that the local government in Al Muthanna, its city of Samawa, (250 km south of Baghdad), the direct intervention with the Office Prime Minister, and the coordinating body between the provinces to shut down the plant until they agree on the technical solutions do not affect the energy being primed to maintain because they are suffering from severe shortages in power generation and the need to revive, according tospecialists.
    [You must be registered and logged in to see this link.]

      Current date/time is Sat 09 Nov 2024, 1:38 pm