Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    Implementation of giant projects at one billion dollars

    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 277102
    Join date : 2012-12-21

    Implementation of giant projects at one billion dollars Empty Implementation of giant projects at one billion dollars

    Post by Rocky Thu 11 Sep 2014, 6:05 am

    Implementation of giant projects at one billion dollars


    9/11/2014 0:00 


    Al-Mansour completed building complexes housing and low cost
    of Baghdad, Qassim Hilfi Rifaat Al-Mansour General Construction Contracting size commissioned projects implemented in the areas of housing and government buildings to one billion dollars, while completed the completion of a number of housing projects is low cost, and embarked on the completion of complexes of this type where he became leading it. major projects director of the company Zidane behind Laibi said "morning": that the company is the largest construction company reached its turnover and its commitment to financial to one billion dollars which is the total cost of projects which the company operates. adding that the landmark projects completed during the months of the year and delivered and operated by its users and the most prominent of those projects, the completion of the Faculties of Veterinary Medicine and Agriculture in the Abu Ghraib area, is also working on the delivery of building the Faculty of Law at the University of Baghdad, which delayed completion of the presence of remnants of war in the place of construction has been a change of venue after conducting surveys of new and soil testing. pointed out The delivery of the building will be within the next month after the arrival of the percentage of completion to the stages of completion, adding that the company has completed the building of the judiciary, the first of its kind in Iraq, consisting of five floors and is a milestone in Baghdad and implemented at a cost of 28 billion dinars, as the company completed construction of a group Schools this General and filled students and schools are under way will be delivered during the month of October next. Laibi confirmed delivery of the company's 95 elementary schools instead of mud and ramshackle of the total 102 school commissioned created in Baghdad, Wasit, Babil. projects, housing and Director General explained that the company was completed before the period of construction projects for housing and sessile cost in the north and south of the province of Kirkuk by 330 houses each after building houses an area of 150 meters, a design and implementation of a value not exceeding 2830 million dinars, stressing that the implementation has been using the substance blocks existing in abundance in the province, which is cheap and Banhaouat distinct and ceilings ready been cast in plant turnkey construction of the company in the province is to reduce the cost and manpower and time, as it includes dwelling per two bedrooms, lounge, kitchen and attachments. increased by saying: "The experiment was re-implemented in Wasit province, as it signed a contract to build a 2500 house is low cost with the participation of Turkish companies close to the same style of iron and insulating material wrapped Eonkerat and gypsum boards from the outside and the inside, but the cost has reached 40 million because of the designs of the Turkish company and change the methods of delivery of the materials used in the building after security events, and reached the stages of completion in the complex to 40 percent of the planned and tarry work there because the difficulty of delivering material to the work site. housing units as explained Laibi that the company implements investment projects giant in partnership with English in the area Altajiat staff and the Ministry of Construction manner (ICF) is one of the ways of modern technology, and the unit is composed of residential apartment buildings of two floors and is a project is low cost somewhat What, reaching the percentage of completion where the stages are good, and includes more than 1,300 residential units, also referred to the company complex project Khmrh in Dhi Qar province in the same way and we wait to solve the problem of evacuating the land allocated and a 300-unit Sknah.ofatt that these projects will enter the modern technology to the country and preserve the environment in which they are consumed by the extraction of raw materials for bricks and cement from the ground and damage them, while alternatives are available from cork remnants of oil and gain factor time, effort and cost of a dielectric material and energy availability.

    [You must be registered and logged in to see this link.]

      Current date/time is Sat 07 Sep 2024, 7:47 pm