Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    Resumes the extension of optical cable networks in liberated areas

    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 281148
    Join date : 2012-12-21

    Resumes the extension of optical cable networks in liberated areas Empty Resumes the extension of optical cable networks in liberated areas

    Post by Rocky Sun 13 Aug 2017, 3:55 am

    Resumes the extension of optical cable networks in liberated areas



    13/8/2017 1:54 AM


    Baghdad / Asra al-Samarrai The
    Ministry of Communications has completed the implementation of the optical cable project and the preparation of designs and maps of optical network paths in the provinces of Nineveh, Anbar and Salah al-Din.
    The official spokesman of the ministry, Hazem Mohammed Ali, told Al-Sabah: The General Company for Communications and Infrastructure of the Ministry has started the completion of the project of optical and copper cable in Anbar province. It has re-established the infrastructure of communication stations that were destroyed because of the terrorist operations, All their capabilities. He added that the ministry, after the liberation operations, launched a state of maximum alert for all its staff in Anbar province to harness the human resources in order to restore the work of communication joints and lift them out of the devastation, pointing to the rehabilitation of Fallujah photovoltaic station and optical cable of the path of Fallujah Baghdad 300 kilometers towards the area of ​​Abu Munisir, Baghdad.
    Ali said that the technical and engineering staffs have re-operated wet, central, Khalidiya and Fallujah substations, especially after being rehabilitated by the copper cable body operating in the Directorate of Communications and Anbar Post. The telephone lines were restored to citizens who exceeded one thousand telephone lines, in addition to the rehabilitation of 700 km of cables The light of the first tracks connects the gray - 160 km - Nukhayb - Karbala and Baghdad with a distance of 300 km, while the second track extends to Ramadi - 160 km - Wetla Trebil with a distance of 400 kilometers.
    He confirmed that the ministry had previously coordinated with the Directorate of Civil Defense in Anbar province to remove the war debris, explosives and improvised explosive devices from the building of the Directorate of Communications and Anbar Post (the new site), as the removal and removal of remnants of a war missile from the roof of the building, four floors after dismantling.
    He pointed to the immediate rehabilitation of the infrastructure completely destroyed in the province of Nineveh, as the ministry began to rehabilitate the Mosul module to complete the optical cable project, especially after completion of the tracks that were sabotaged because of terrorist operations, as the technical staff began working on the statistics of the number of buildings destroyed.
    He noted the formation of committees to maintain the preparation of designs and blueprints for a project optical cable , which will provide communications , high - speed Internet for the people of Mosul through coordination with networks and projects department of the General Company for Communications and infrastructure service, as has
    direct also set up access optical network in Salah al - Din province and the delivery of cable project Photovoltaic systems to homes and government institutions.

    [You must be registered and logged in to see this link.]

      Current date/time is Sun 24 Nov 2024, 12:29 am