Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    After the complete shutdown... Electricity issues a statement about the system's return to work

    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 280852
    Join date : 2012-12-21

    After the complete shutdown... Electricity issues a statement about the system's return to work Empty After the complete shutdown... Electricity issues a statement about the system's return to work

    Post by Rocky Fri 02 Jul 2021, 7:00 am

    After the complete shutdown... Electricity issues a statement about the system's return to work

    •  Time: 07/02/2021 12:33:03
       
    •  Reading: 598 times

    [You must be registered and logged in to see this image.]
      
    {Local: Al Furat News} The Ministry of Electricity issued a statement after the system stopped working completely, indicating that the owners were able to return the national electricity system to work in record time after it was subjected to a complete halt at dawn today
     The useful summary.. In important news, you can find it in the Euphrates News channel on the telegram.. [You must be registered and logged in to see this link.]
    And she confirmed in a statement that {Euphrates News} received a copy of it today that "all the owners have been working since the accident that the system stopped working to restart the obstetric units in all electrical power production plants to return to the production reached by the system yesterday evening, Thursday, which amounted to (18,500) megawatts, despite the targeting. Terrorism and sabotage that exposed and exposed the electric power transmission lines.
    The ministry appealed to the security authorities, tribal sheikhs and citizens to cooperate with them to intervene and report any suspicious movements that occur near electric power transmission lines and towers.
    It indicated that there have been programmed and continuous targeting of electric power transmission lines over the past days, with the rise in temperatures, which led to the instability of the power system, which resulted in the separation of the two high-pressure electric power transmission lines (thermal fluid - gaseous media) (1 and 2), at the dawn of this Today, Friday, because of which the power system stopped..
    While the Ministry of Electricity is mobilizing its staff to restart the obstetric units, the high-pressure electric power transmission line (132 kV), (Jerusalem - Karkh water) was subjected to detonation of explosive devices placed under a number of its towers at ten o'clock this morning, Friday. With the aim of dismissing him and removing him from work to increase the suffering of the citizens, the engineering and technical staff immediately went to the site of the accident, accompanied by the security forces, and started maintenance work.
    Raghad Daham
    [You must be registered and logged in to see this link.]

      Current date/time is Fri 15 Nov 2024, 3:35 pm