Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    Station Basmajh Alkahrbaih is solving the problem of Baghdad, the end of 2018

    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 281267
    Join date : 2012-12-21

    Station Basmajh Alkahrbaih is solving the problem of Baghdad, the end of 2018 Empty Station Basmajh Alkahrbaih is solving the problem of Baghdad, the end of 2018

    Post by Rocky Sun 16 Apr 2017, 1:57 am

    Station Basmajh Alkahrbaih is solving the problem of Baghdad, the end of 2018


     Baghdad / term

    Many years have passed and the capital of Baghdad with a number of Iraqi provinces receive a large summer shortage in processing power, with temperatures reached in recent years to more than 50 degrees Celsius, sparking protest movements and large - scale. But no solutions to remember and processors are, this summer will be different, as reported Holding Company "Mas Group" (MGH) Jordanian Energy in a statement signed a partnership contract with General Electric US company to build a giant electric power in Baghdad station, while confirming the Ministry of Electricity to Baghdad power plant , which will be its production capacity after completion 3000 MW, and ends with the work by the end of 2018, will be allocated as the bulk of its production to feed the capital, which it is hoped that it contributes to solving the energy crisis which dramatically.
    A spokesman for the Ministry of Electricity Musab teacher says in an interview for "(to the extent), the ministry signed a contract with MAS Group Holding Company to build a plant Basmajh investment, the productivity of 3000 MW card, and be in four phases, the first building four units of gas card 250 MW each, total capacity of 1000 MW, while the second part of this phase is the construction of 2 units operated vehicle on the exhaust emitted from gas units and Tkonan adjacent to the gas units and energy , each of which is also 250 MW, in the sense that the first phase will be 1500 MW.
    he adds the teacher: The second phase is the construction of four gas units Yeh card 250 MW per unit, ie a total capacity of 1000 MW, and will then build 2 units a vehicle card 250 MW total capacity of 500 MW to become the capacity of the plant in full 3000 MW, adding that the company contracted with completed now , the first four units have entered service now in the city Basmajh, adding: that the "3000 MW which will be the total energy of the plant is certainly Stngzy including the capital, the fact that the city Basmajh need not only 50 MW, so it is the" 1000 MW first share capital of Baghdad will certainly be , and the "500 MW will enter service before the next summer , which will also be 90% of the capital Baghdad, said the "3000 MW in the future of which will benefit more than the capital of Baghdad, and the station will be completed at the end of 2018, and will contribute to solving the energy crisis in the capital is very large.
    Chairman of the "MAS Group" Holding Ahmed Ismail said in a press statement recently we have made outstanding achievements in the three stations run power generation using the techniques of GE, we are committed to cooperate with the Iraqi government to work together to establish infrastructure strong and high efficiency of the electricity sector in the country, Baghdad power plant and represents the Basmajh forerunner to the level of activating the role of the private sector in central and southern regions of Iraq step, it is by strengthening the electricity grid productivity, we will contribute to pushing forward the march of economic development, and achieve the aspirations of the Iraqi people. "
    as the Executive Director of projects a President Systems of gas energy at the "GE" Mohammad Ali is also announced in a press statement recently that his company reaffirm our deep commitment to support the efforts to meet the demand for energy resources , thereby contributing to the strengthening of the process of economic growth in Iraq, and for the good to everyone, and invest our efforts -bparwa Basmajh- , which will set new standards on the level of the energy sector in Iraq in cooperation with the 'MAS Group Holding through an independent power plant characterized by financial sustainability and adopt best practices to reduce harmful emissions and reduce maintenance costs. "
    The company "General Electric" and "MAS Group Holding" indicated in a statement on Saturday to the success of the commercial operation of simple cycle operations for four modern gas turbines 9F developed "GE" within the first phase of the "Baghdad power station" of the Ministry of Electricity Project model in Basmajh, where the property is located about 40 kilometers east of Baghdad, the first station to be developed outside the borders of the Kurdistan region independent producer system of energy based on the construction, ownership and operation for the benefit of the Iraqi Ministry of Electricity, where the former power projects owned and operated by the Ministry.
    The statement added: As the new project was created and will be run by "MAS Holdings" to add upon completion of all stages, (3000) MW to the national grid, which will contribute to an essential role in meeting the growing electricity resources, expected to start commercial operation of the second phase of next year project.
    The General Electric Company has set up its projects in the Kurdistan region , where supplied Arbil, Sulaymaniyah and Dohuk advanced equipments company MAS Energy Group, which combined with a capacity of generating up to 4 thousand MW power plants.
    It is noteworthy that the whole of Iraq is still suffering from the electricity crisis, as a result of not keeping up with production to increase the growing consumption, at a time when needs about 6,500 megawatts to meet the needs of energy, and some believe that the solution to the energy crisis is not only to control the Aldhaiat management power successfully sell and rationalize consumption .

    [You must be registered and logged in to see this link.]

      Current date/time is Mon 25 Nov 2024, 11:46 pm