Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    Development of the Gharraf field by establishing 24 new wells within two years

    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 270339
    Join date : 2012-12-21

    Development of the Gharraf field by establishing 24 new wells within two years Empty Development of the Gharraf field by establishing 24 new wells within two years

    Post by Rocky Mon 19 Feb 2018, 1:25 am

    [You must be registered and logged in to see this image.]
    Development of the Gharraf field by establishing 24 new wells within two years


     Dhi Qar / Hussein al-Amel 

    The oil company of Dhi Qar, on Saturday, the opening of an oil project to develop the Gharaf oil field north of Nasiriyah. While the project works include drilling 24 wells implemented by the Chinese company great waal, she pointed out that the improvement in oil prices contributed to the resumption of projects to develop production in the field mentioned after stumbled as a result of the financial crisis.
    "The Director General of Dhi Qar Oil Company Ali Ward Hamoud inaugurated the integrated drilling services project in the field of oil Gharraf and inaugurated it by opening and connecting the first wells to the main isolation, treatment and pumping station where the well was connected GA-Q59 P "of the mentioned station," noting that "the project includes the drilling of 24 oil wells through three towers, the Chinese company implemented the project in the field of oil Gharraf." 
    "The project is being implemented by the Chinese great waal company under a contract between the Ministry of Oil and the operator of the Gharraf field in Malaysia Petronas." 
    "The completion of drilling work for 24 wells in two years to become the number of wells in the field of oil Gharraf 78 wells, where the field currently in operation with 54 oil wells," pointing out that "each new phase of production requires the drilling of additional wells to supply and sustain production"
    "The improvement in oil prices contributed to the resumption of projects to develop the production of the oil field of Gharraf after stumbling as a result of the financial crisis." 
    He explained that "the project is one of the large projects that aim to maintain the sustainability of current production and upgrading it according to the final development plan," stressing "the contribution of the project to absorb more local labor and promote the production of the field and support the national economy and strengthen the location of the oil company Dhi Qar between the oil companies, . 
    "Other oil projects will be announced in the next few months by the Dhi Qar oil company, including the drilling of wells through the Iraqi Drilling Company and production lines and oil installations," Jabara said. 
    He praised the director of the oil field Gharraf role of the oil company Dhi Qar in the field of project delivery and completion and obtaining ministerial approvals in record time.
    And the reasons that prevented the field of oil Gharaf reached the ceiling of production scheduled for 2017, which was scheduled to be 230 thousand barrels per day said the director of the field Gharraf that "the repercussions of the financial crisis and the decline in oil prices globally reflected on the entire oil industry in the world, This crisis has affected the work of developing production in the field of oil Gharraf, whose current production rate is estimated at 100 thousand barrels. "He pointed out that the reduction of budgets allocated for the development of the oil industry in the past years had a significant impact on the plan to develop the oil field, Required within a folding plan T production in the field mentioned. 
    He pointed out that "the improvement in oil prices contributed to the resumption of projects to develop the Gharraf oil field and launch a project involving 24 new wells."
    On January 19, 2010, Petronas and Japan signed a contract with the Ministry of Oil to develop the Gharraf field in the province of Dhi Qar, which involves the drilling of 240 wells by 2017. This will allow raising the ceiling of oil production from Gharraf fields to 230 thousand barrels per day 2017. 
    the regional director of Malaysia's Petronas in Iraq , Abdul Malik Jaafar, announced (October 10, 2016) plan to raise the production of the Garraf oil field of 100 thousand barrels per day to 120 thousand barrels during the next year, as he pointed to coordination with the Ministry of oil and oil company South in this regard, confirmed the company's receipt of a list of service projects prepared by The local government to implement in the vicinity of Gharraf field.
    The estimated oil reserves in the oil fields of Dhi Qar more than 20 billion barrels are distributed on the fields of Gharraf and Nasiriyah, Abu Column and Sabeh field, while the total current production of the fields of Gharraf and Nasiriyah about 170 thousand barrels per day. 
    On January 5, 2016, the Cabinet formally approved the establishment of the Dhi Qar Oil Company. 
    The date of production of oil in Dhi Qar to 2007, where the first stage of development of the oil field of Nasiriyah began early this year, with an initial production capacity estimated at 12 thousand barrels per day. 
    On February 8, 2016, the Dhi Qar Directorate expected the production of natural gas from Gharraf oil field, north of the province, 350 km south of Baghdad, during the current year, indicating that the production of natural gas from the oil fields will cover the local need, The environment from the risks of pollution resulting from the combustion of gas associated with the extraction of oil.



    [You must be registered and logged in to see this link.]

      Current date/time is Sat 18 May 2024, 8:14 pm