Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    In preparation for the running of trains .. Transportation begins to rehabilitate the Baghdad-Mosul

    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 277821
    Join date : 2012-12-21

    In preparation for the running of trains .. Transportation begins to rehabilitate the Baghdad-Mosul  Empty In preparation for the running of trains .. Transportation begins to rehabilitate the Baghdad-Mosul

    Post by Rocky Fri 30 Apr 2021, 8:01 am

    In preparation for the running of trains .. Transportation begins to rehabilitate the Baghdad-Mosul railway line

    [ltr]2021.04.30 - 13:54[/ltr]


    [You must be registered and logged in to see this image.]
    [size=16]like [size=16]0 
    [/size][/size]

      
    Baghdad - People  
    On Friday, the Ministry of Transport announced the rehabilitation of a railway line(Baghdad - Mosul).  
      
    [You must be registered and logged in to see this link.]  
      
    A statement by the ministry, which "people" received a copy of, (April 30, 2021) stated, "The engineering and technical staff of the Ministry of Transport / the General Company for Iraq Railways continue their campaign to rehabilitate the (Baghdad - Mosul) railway line to the Mosul station, in preparation for To replayRunning of freight and passenger trainsIn the near future for the entire northern region. "  
    "This is in light of the directives of the Minister of Transport, Captain Nasser Hussein Bandar Al-Shibli, to continue efforts and restore life to the affected areas, and continuous follow-up and field visits to the sectors of the northern region before," he added.General Director of Railways, Mr. Talib Jawad Kazem Al Husseini.  
    He continued, "As the area witnessed the loading of hinged wooden beams and hinged parts from the Debs station to rehabilitate the railway lines and joints in the refinery.In Baiji, as well as a station in front of Dor. "  
    Al-Husseini said, "What the region witnessedAmong the various field activities in the (Hammam Al-Alil - Mosul) sector, through the direct extension of the railway connections on the archways that have been completed, and the removal of debris from the Al-Sukkar Bridge and the Al-Bou Seif railway tunnel in km 398, as well as the Al-Ghazlani Bridge in km 402, as it witnessed the process of removing the rubble and starting the burial work. Work is continuing in full swing, and on all axes within the vicinity of the area to prepare the requirementsNecessary to run its trains from Baghdad to Mosul all the wayTo Turkey via the dry canal to support the economyAnd to maximize the financial resources of the company. "  
    [You must be registered and logged in to see this link.]

      Current date/time is Fri 20 Sep 2024, 8:11 pm