Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    Baghdad Municipality is preparing for the opening of the great Rusafa water project officially will

    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 281267
    Join date : 2012-12-21

    Baghdad Municipality is preparing for the opening of the great Rusafa water project officially will  Empty Baghdad Municipality is preparing for the opening of the great Rusafa water project officially will

    Post by Rocky Sat 30 Jul 2016, 3:25 am

    [You must be registered and logged in to see this image.]
    Baghdad Municipality is preparing for the opening of the great Rusafa water project officially will cost more than one billion dollars


     Baghdad / Zia Hatem 

    Confirmed the Baghdad Provincial Council, on Friday, and there is the reluctance of thecompletion of water large Rusafa project, and as pointed out that supposed to complete the project in 2010 , which will cost more than a trillion and 131 billion dinars, the Baghdad Municipality announced its willingness to open officially remove excesses. 
    The Chairman of the Committee of Construction and development in the Baghdad Provincial Council Ghalib Zamili, in an interview with (long - Presse), "there is a reluctance to complete the Rusafa water Kabiralve project is one of the strategic projects with an output capacity of 910,000 thousand cubic meters per day, which has a high technical specifications and save the province from stinginess" . 
    he Zamili, that " it was hoped that the project is completed in 2010, but delays came from companies that oversaw the implementation of the project , which will cost a trillion and 131 billion and 424 million dinars , " noting that "this project is a great achievement for the secretariat of the Baghdad bombings Karrada was thereason for the delayed opening. " 
    For his part, Director General of the Media Secretariat of Baghdad , Hakim Abdul Zahra, in an interview with(long - Presse)," the project Implemented fully and the subject of the preliminary opening was complete and preparations. " 
    stressed Abdul - Zahra, that" the Baghdad Municipality at the stage of the establishment of the celebration of the official opening, there will be calls to set on the opening day , "pointing to" the existence of problematic hindered the progress of the project. " 
    He noted Abdul - Zahra" there overruns on the project by multiple parties , including power transmission lines as well as the removal of residential areas and other planted was need to be a period of time to remove them. " in 
    turn, the director general of Baghdad 's water Ammar Moussa, in an interview with (long - Presse)," theproject was delayed for the period stipulated in the contract, there are excesses embarked Baghdad Municipality to remove them. " 
    Moussa added that" the project was completed, and we started pumping water served areas Obeidi and luxury inspired victory and other areas of Sadr city , "noting that" the previous years have been complaining about those areas of the lack of enough water , especially with high temperatures in the summer. "
    [You must be registered and logged in to see this link.]

      Current date/time is Mon 25 Nov 2024, 6:51 pm