Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    Basra Steel and Iron adds a new production line in the pipe industry

    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 269063
    Join date : 2012-12-21

    Basra Steel and Iron adds a new production line in the pipe industry Empty Basra Steel and Iron adds a new production line in the pipe industry

    Post by Rocky Fri 17 Apr 2020, 1:52 pm


    Basra Steel and Iron adds a new production line in the pipe industry

    21:14 - 17/04/2020



    [You must be registered and logged in to see this link.]
    Information / Basra ..
    The General Company for Iron and Steel announced, Friday, the addition of a new production line in the pipe industry.
    "The General Company for Iron and Steel has added a new production line in the pipe industry, which is the production plant for welded tubes," he said in a statement to Information Agency.
    He added that "the company previously had a factory for the production of spirally welded tubes, and now the welded pipeline has been added longitudinally."
    He noted that, "The longitudinal pipeline plant would have opened during the current month of April, but due to the Corona crisis and the embargo measures, the opening was postponed."
    Pointing out that, "The new plant will meet the country’s need for this type of pipeline and supply the Ministry of Oil and all state ministries with pipelines." End / 25p


    [You must be registered and logged in to see this link.]

      Current date/time is Sun 28 Apr 2024, 4:42 am