Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    Electricity signed a contract for $ 126 million to set up a station Basmajh

    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 270014
    Join date : 2012-12-21

    Electricity signed a contract for $ 126 million to set up a station Basmajh Empty Electricity signed a contract for $ 126 million to set up a station Basmajh

    Post by Rocky Mon 06 Jun 2016, 3:32 am

    [You must be registered and logged in to see this image.]
    Electricity signed a contract for $ 126 million to set up a station Basmajh


     Baghdad / long-Presse 

    The Ministry of Electricity announced thatconcluded a contract to build a power station Basmajh manufacturing (400 kV), and with the opening of two Thoilitin mobile clinics in the city of Ramadi , to restore electricity to the city and spend the Heat confirmed, theproduction of energy directorate in Dhi Qar began running the station (Alautw Transfer) experimentally, stressing that the station will add manufacturing capacity of 200 MW to thenational grid. a ministry spokesman, Musab teacher, in a statement, received a (long - Presse), that " the presence of the Minister of Electricity Qassim Mohammed Fahdawi, the Secretaries of State, and a number of general managers in which, the ministry entered into a contract with MAS Holdings, to build a power station Basmajh manufacturing (400 kV), which will contribute to the decoder bottlenecks in areas south of Baghdad, along with Thuelleta electric power complex Basmajh residential. " He pointed out the teacher that" the contract 126 million, four hundred thousand dollars in value , " noting that " the contract wording will be payment mechanism on credit for three years , " pointing out that "the company has been executing granting ensure sovereign by the ministry." for his part, the Director of MAS Holdings, Ahmed Ismail, according to the statement, said that "this is animportant station universe absorptive capacity , enabling it to energy conversion capacity 3,000 MW. " theministry said in a separate statement, said that" Electricity Minister Qassim Mohammed Fahdawi, and thepresence of the governor of Anbar Suhaib al- Rawi and members of the provincial council and a member ofthe House of Representatives Faris Taha knight and a number of directors general and tribal leaders of Anbar, opened yesterday at two Thoilitin mobile units Ramadi (132 kV), it was through them restore power to the city of Ramadi and spend the Heat, after qualifying carrier lines of electric power feeding the city of Ramadi, Hit, which have been singled out and separated by terrorists Daash. " the statement said that "monument stations Althoilitin Almtnqlten, has been accomplished by the cadres of the General Directorate for the transfer ofelectrical energy for the upper Euphrates, in stations gray old and new Althoilitin site, which were subjected to mass destruction by terrorist Daash." I promised the Ministry of Electricity, according to the statement, therehabilitation and re - power transmission lines electricity to the city of Ramadi and spend Hit and set up two plants Althoilitin Almtnqlten, a "great achievement after the completion of the implementation in record time."in a related context, general manager of electric power production in the province of Dhi Qar beauty Ghulam Ali said in an interview with (long - Presse), " the technical and engineering staff in the departments of energy networks and the southwest production commenced pilot operation of the station (Alautw Transfer) fifth in Nasiriyah thermal power Station , "noting that" the station will enter service during the next two days. " Ali added," the Alautw station can add manufacturing capability of 200 MW to lift so the manufacturing capacity in the national electricity system to maintain 800 MW to 1000 MW , "he said , adding," the station has been processed within the development of specific regions to maintain the plan at an estimated cost of more than three and a half billion dinars. " He was general manager of energy production electrical in Dhi Qar, expressed the hope that "contributes to improving the operation of the station 's power supply system of the national electricity in the province."
    [You must be registered and logged in to see this link.]

      Current date/time is Mon 13 May 2024, 3:25 pm