Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    Development Road.. Completion of soil investigation, topographic survey and railway line

    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 277299
    Join date : 2012-12-21

    Development Road.. Completion of soil investigation, topographic survey and railway line Empty Development Road.. Completion of soil investigation, topographic survey and railway line

    Post by Rocky Wed 14 Aug 2024, 6:45 am

    Development Road.. Completion of soil investigation, topographic survey and railway line

    [You must be registered and logged in to see this image.]



    [You must be registered and logged in to see this link.] [You must be registered and logged in to see this link.] [You must be registered and logged in to see this link.] [You must be registered and logged in to see this link.]



    Economy News - Baghdad
    The Ministry of Transport announced today, Wednesday, the completion of soil investigation, topographic survey and railway line for the development road project, noting that the completion rate of the initial designs for the expressway has reached 75 percent.
    The ministry said in a statement received by "Al-Eqtisad News", "Based on the directives of the Minister of Transport, Razzaq Muhaibis Al-Saadawi, to expedite the finalization of the preliminary design phase of the development road project, the Iraqi General Railway Company announces the increase in the rates of completion in the preliminary design phase of the project," indicating that "the preliminary designs for the railway line, the topographic survey and soil investigation operations for the project have been completed by 100 percent."
    He added that "the completion rate of the initial designs for the expressway has reached 75 percent and its designs will be completed next September," noting that "the length of the expressway is 1,131 km, while the length of the railway line is 1,201 km."
    The ministry had previously reported the completion of the first section of the development road project, which is the road linking the entrance to Faw Port and the submerged tunnel, which is 63 km long. The road became passable after the completion of the first layer of asphalt, with a length of 51 km, which passes through the submerged tunnel and then passes through two bridges, the first of which has a completion rate of more than 96%, and the second 77%, and the fifth berth of Faw Port has been covered, while the five berths project will be fully received in October of this year according to the specified timetables.
    [size]
     
    To view the latest news, follow us on Telegram
    [You must be registered and logged in to see this link.][/size]



    Views 43
    Added 2024/08/14 - 1:44 PM
    [You must be registered and logged in to see this link.]

      Current date/time is Tue 10 Sep 2024, 10:29 pm