Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    Construction and Housing: the implementation of 70 projects for the maintenance of roads and bridges

    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 281148
    Join date : 2012-12-21

    Construction and Housing: the implementation of 70 projects for the maintenance of roads and bridges Empty Construction and Housing: the implementation of 70 projects for the maintenance of roads and bridges

    Post by Rocky Mon 25 Mar 2013, 3:48 am

    Construction and Housing: the implementation of 70 projects for the maintenance of roads and bridges in all the provinces at a cost of more than 120 billion dinars


    Author:
    Editor: AF, RS 03/24/2013 17:46
    Term Press / Baghdad

    The Ministry of Construction and Housing, on Sunday, the General Authority for Roads and bridges of the ministry continue its work in 70 projects for the maintenance of roads and bridges throughout the country at a cost of more than 120 billion dinars, confirming that it intends to implement in accordance with their designated times.
    The Information Office of the Ministry in a statement received (range Press) copy of it, "The General Authority for Roads and bridges are being implemented maintenance process for several projects is the way Holi in hand new coast (5 km), and maintenance of the road link between Highway Traffic and Road Sayafiyah (17 km), and by (YUSUFIYA - issued Yusufiya) length (12 km) and the road to Baghdad - Baquba (10 km). "
    The statement added that "work is continuing on several projects in the province of Diyala, including maintenance through Baquba - Khan Bani Saad, a length (12 km), and through the death - the new Baghdad length (20 km), and maintain the pure - great length (23 km)," noting that "Dhi Qar province experiencing maintenance Tel meat and control by vine - Tar (7 km) and the rehabilitation of the concrete bridge Dhi Qar, and maintenance of the entrance to Nasiriyah and Gharraf Bridge."
    The statement continued that "Qadisiyah province is also experiencing maintenance through Gmas - Junction Gmas length (10) kilometers, and through Official - Sadeer length (13 km), and maintenance through Afak - Al Bedair."
    In Anbar province confirmed the statement of work b - "maintenance project through existing - modern long (33 km), and the project through Ameriya - tourist city along (42 km), and the rehabilitation of Bridge Project in kilometer (70) on the road to gray - wet old and maintenance project through Ramadi - Fallujah long (26.5 km), "noting that the province of Muthanna experiencing maintenance (10 km) of road Salman / first phase, and through Samawa - vegetables, and maintenance of the decline on the road (Samawa - salted), maintenance (14 km) from the road ( Samawa - salted intersection). "
    The statement noted that "the ministry and through the General Authority for Roads and Bridges work on processing of traffic signs for Highway, expansion and maintenance of the joints and protective fences and iron bridges Alfoghanih, and processing of traffic signs is Almgesrh crosses Highway Traffic."
    In Babil province, the ministry explained that "supervision underway on the maintenance by Moelhh, and maintenance (38.5 km) of road suit - Baghdad, and maintenance of a bridge rail Baghdad - Basra, as is maintained by a bridge Fayhaa - Shalamjah corridor first in the province of Basra, and raise Bridges Alhaddidiin River splendor, and planning through Basra - FAO (87 km), and maintenance of road bridge Fayhaa - Shalamjah second corridor, through Zubair / Nasiriyah (19 km) and maintenance of the concrete bridge vine. "
    The statement noted that the province of Salahuddin witness "maintenance (through Samarra - country) length (35 km), and Ex Samarra length (22 km), while experiencing Karbala maintenance and EXA by Ibrahimieh long (8 km) and through Karbala - Indian length (9.6 km), and is maintained by Kirkuk - Baghdad (23 km) and maintenance of Grand Bridge Tuz and bridges tea first and second in the province of Kirkuk. "
    In the province of Maysan statement noted that "supervision underway on the Road Maintenance Building - Alaptarh - dawn length (30) kilometers, and through architecture - good length (66 km), and through architecture - Basra length (20 km), and through architecture - Kut length ( 20 km) back and forth. "
    The statement continued that "the province of Najaf witnessing maintenance by Al Badir (11 km), and maintenance (8.5 km) of road Kufa Cement Factory, and by (Najaf - Karbala) (12 km).
    The statement noted that "the province of Nineveh experiencing maintenance bridge Mosul V, through connector - Bashiqa length (9 km), and through urban length (27 km) and EXA through Mosul - Alkwyr length (24 km) and maintenance of bridge Qayyarah, and maintenance of border road Rabia - تربكا and processing marks traffic and maintenance of several arches, "stressing that" Wasit province is witnessing the implementation of the Road Maintenance Kut - Baghdad (23 km) and the intersection of Numaniyah and through Kut - Architecture (35 km).
    The Ministry of Construction and Housing has implemented and is still continuing in the implementation of many of the highway projects and corridors, bridges and road maintenance in Baghdad and the provinces, while witnessing their work sometimes been criticized for the delay or non-conformity with the specifications or outsource contractors are not eligible


    [You must be registered and logged in to see this link.]

      Current date/time is Sat 23 Nov 2024, 10:47 am