Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    Academic calls to activate the link with the eight countries

    day dreamer
    day dreamer
    Interacting Investor
    Interacting Investor


    Posts : 3197
    Join date : 2012-12-19

    Academic calls to activate the link with the eight countries Empty Academic calls to activate the link with the eight countries

    Post by day dreamer Thu 10 Sep 2015, 12:14 am

    Academic calls to activate the link with the eight countries

         

     9/10/2015 0:00


     
    BAGHDAD - Imad Emirate
      He called academic d. Rahim Hassouni from the Faculty of Management and Economics at the University of Baghdad to activate the electrical connection between the eight countries Agreement (Iraq, Egypt, Jordan, Turkey, Syria, Lebanon, Palestine, Libya) and connect them with the Gulf Group for the East and the Maghreb to the west and the European north to make up the shortfall in the production of energy from sources other investment and operational Bklv low. Said Hassouni In response to a question »Sabah» on the problems and challenges facing the electricity sector attributing the cause to cumulative problems, some of which require quick solutions and the vessels of which speed up the completion of all production systems and electric power transmission and specifications required and the issuance of legislation requiring all relevant ministries, particularly the ministries of ( electricity and oil) in coordination with each other, in addition to the gradual replacement of obsolete generating units which have deteriorated readiness, efficiency and increased cost of operation and maintenance of new generating plants so as not to affect the national grid.
    He stressed the need to speed up the application of smart grid program to monitor the performance of the national system with improved electrical load management at peak times, indicating the importance of activating the role of religious institutions and systems of civil society in order to rationalize energy consumption and contribute to the development of ways to minimize wastage and squandered with the use of devices energy-saving.
    He noted academic to the importance of the ability of decision-making to the appropriate competencies of experienced and competent and concern for the national interest and commitment to the principle of transparency, as well as take advantage of evaluating the results of the Arab countries such as Jordan and Egypt, as well as the province of Kurdistan in the area of ​​privatization of electricity and projects generating private sector in order to benefit from them and try to apply As our society agrees. He called for encouraging the use of renewable energy sources and to develop incentives to invest with the need to speed up by the Ministry of Electricity to complete conversion of aerobic networks in all provinces to ground networks in order to avoid leakage of these networks and through the development of a period of time so it was supposed to be determined in the central of the ministry's five-year plan with the necessity of the application of deterrent legal action against the squatters on the national grid.



    [You must be registered and logged in to see this link.]

      Current date/time is Sun 07 Jul 2024, 10:18 am