Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    Industry is ready to build 176 bridges in liberated areas

    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 280306
    Join date : 2012-12-21

    Industry is ready to build 176 bridges in liberated areas Empty Industry is ready to build 176 bridges in liberated areas

    Post by Rocky Tue 01 Aug 2017, 2:38 am

    Industry is ready to build 176 bridges in liberated areas

     

    The State Company for Steel Industries, a member of the Ministry of Industry and Minerals, announced Tuesday that it is ready to build bridges and equip the electricity poles for the liberated areas.

    The company's director general, Jalal Abbas Hussein, said in a press statement that "the company seeks to enter strongly in the reconstruction of damaged bridges located in the liberated areas in the provinces of Nineveh, Salah al-Din and Anbar, which is estimated at (176) bridges, By contributing to the re-manufacturing of the iron tributaries of damaged bridges. "

    He added that "the company is equipped with a modern Italian line of origin for the manufacture of steel tributaries at a depth of 2 meters and a length exceeding 24 meters." He added that "the company's active contribution to the reconstruction of the bridge Muthana, which was opened recently, While it has had other successful experiences in the reconstruction of the old and modern Diyala bridge and the bridge of Samarra and other bridges in different parts of Iraq. "

    "The company is ready to contribute to the reconstruction of the liberated areas, through the manufacture of poles of distribution of electricity of various types of circulation and network 9 meters and 11 meters, in addition to the manufacture of poles grided 12 meters and 14 meters, as well as the possibility of reconstruction of industrial workshops and stores, where The company can manufacture all types of roofing and keratin, power transmission towers, and can enter the field of manufacturing of caravans and prefab houses.

    He stressed that "there are attempts to the company to contribute to the rehabilitation and reconstruction of Baiji refinery, as it has already manufactured an oil refinery capacity of 10 thousand barrels per day, and has the experience and the possibility of manufacturing oil equipment such as tanks and pressure vessels and heat exchangers," declaring at the same time " With the General Company for Iraqi Cement for the purpose of contributing to the reconstruction of cement plants destroyed in liberated areas, especially cement plants in Sinjar and Badush, by working on the maintenance of furnaces and precipitators and the processing of grinding balls and a lot of products.

    The General Company for Steel Industries was formed after the merger of Al Samoud General Company for Steel Industries and Nasr General Company for Mechanical Industries. It consists of five main factories, namely the steel structures factory, the special steel foundry factory, the crane factory, the towers and the plates, the Zulfikar factory for the mechanical operation and the heavy road and plumbing plant.


    [You must be registered and logged in to see this link.]

      Current date/time is Tue 05 Nov 2024, 8:35 am