Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    Egypt opens a new international airport in a vital area

    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 280438
    Join date : 2012-12-21

    Egypt opens a new international airport in a vital area Empty Egypt opens a new international airport in a vital area

    Post by Rocky Sun 14 Oct 2018, 2:22 am

    Egypt opens a new international airport in a vital area

    Egypt opens a new international airport in a vital area 10546


    Egypt plans on Monday to start the pilot operation of the Sphinx International Airport (west of the capital Cairo) to ease pressure on Cairo airport (east of the capital) as part of its plan to develop airports, ports, transport lines and roads. 
    Sphinx Airport is 12 km from the pyramids, and its vital location contributes to the promotion of day-to-day tourism due to its proximity to tourist attractions in Cairo and Giza.
    The airport is located on part of the Western Cairo Air Force Base, located at 45 km from Cairo-Alexandria Road.
    The airport, which was established according to a specific angle of inclination, bears the weight of the giant planes, according to the Egyptian newspaper Al-Ahram.
    The project was carried out by the armed forces and the Egyptian Investment Company (EEC), in which 200 engineers, 35 consultants and 2,500 workers participated.
    Work on the project continued 12 months for 12 hours a day, at a cost of about 300 million pounds (about 17 million dollars).
    The airport is located on an area of ​​25,000 square meters and has an area of ​​126,000 square meters, with a capacity of 9 aircraft.
    The airport is equipped with the latest thermal monitoring cameras in the world. It consists of the main terminal building, the air control tower and the dozens of service buildings, distributed over an area of ​​26 thousand meters.
    The main building accommodates 300 passengers per hour, and is set to set up a group of international hotels in the region to return them as a tourist attraction.
    The airport also has 4 substations and a meteorological building, as well as a mosque and a parking garage for hundreds of cars.


      Current date/time is Thu 07 Nov 2024, 11:48 am